Laserfiche WebLink
' <br />E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12.NAME 13.ROLE IN THIS CONTRACT <br />Project Engineer -Stormwater <br />14. YEARS EXPERIENCE <br />Orlando A. Rubio, P.E. <br />15.FIRM NAME AND LOCATION (City and State) <br />Craig A. Smith & Associates, Inc. <br />Boca Raton, Florida <br />16.EDUCATION (DEGREE AND SPECIALIZATION) <br />S.S. Civil Engineering, 198 8 <br />University of Florida, Gainesville, FL <br />A.A., 1985 <br />Miami Dade Community College, South Campus, <br />Miami, FL <br />a.TOTAL <br />32 <br />b.WITH CURRENT <br />FIRM <br />20 <br />17.CURRENT PROFESSIONAL REGISTRATION (STATE <br />AND DISCIPLINE) <br />Professional Engineer <br />State of Florida <br />License No. 48265 <br />18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Hydraulic Hydrologic Modeling -Streamline Technologies -ICPR <br />University of Florida -TREOO -HEC -RAS Modeling <br />19 RELEVANT PROJECTS <br />(1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED <br />Village of El Portal PROFESSIONAL CONSTRUCTION (If El Jardin Stormwater Improvements SERVICES ADDlicable) <br />El Portal, Florida 2017 Pending <br />a (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed <br />with current firm <br />Project Manager & Design Engineer: Design, permitting, modeling, bidding, and construction management of a <br />$2.4 million stormwater retrofit project. <br />(1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED <br />Sunshine Water Control District (SWCD)PROFESSIONAL CONSTRUCTION (If <br />West Outfall Canal Improvements SERVICES ADDlicable) <br />Coral Springs, Florida 2014 2019 <br />b (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed <br />with current firm <br />Project Manager & Design Engineer: Conceptual hydraulic modeling of a 2-mile primary canal of the SWCD. <br />Phase 1 design, permitting, modeling, bidding, community outreach, and construction management of the <br />$3,000,000 oroiect. <br />(1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED <br />Spring Lake Improvement District (SLID)PROFESSIONAL CONSTRUCTION (If <br />Stormwater Treatment Area SERVICES Aoo/icable) <br />Sebring, Florida 2014 2017 <br />C (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with <br />current firm <br />Project Manager & Design Engineer: Obtained initial project funding from FDEP. Design, permitting, modeling, <br />bidding, and construction management of a $3,300,000 project. Report for FDEP.