My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith & Associates
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craig A. Smith & Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:39:59 AM
Creation date
8/21/2020 11:38:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
( 1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED <br />Phase IV Stormwater Improvements PROFESSIONAL CONSTRUCTION (If City of Sweetwater, Florida SERVICES ADDlicableJ <br />2010 2017 <br />d (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with <br />current firm <br />Project Manager & Design Engineer: Design and permitting of stormwater retrofit project ($3.8M). Preparation of <br />construction plans, bid schedule, cost estimate, bidding assistance and engineering services for the ongoing <br />construction. <br />(1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED <br />Golden Beach Stormwater Improvements PROFESSIONAL CONSTRUCTION (If <br />Golden Beach, Florida SERVICES Aon/icableJ <br />2008 2012 <br />e (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with <br />current firm <br />Project Manager & Design Engineer: Design and permitting of a stormwater retrofit ($6.0 million). Prepared cost <br />estimated, bid schedule, provided bidding assistance and FEMA orant aoolication documentation. <br />(1)TITLE AND LOCATION (City and State)PROFESSIONAL CONSTRUCTION (If <br />East-West Conveyance Drainage Project SERVICES AoolicableJ <br />Okeechobee, Florida 2015-2017 NIA <br />f (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with <br />current firm <br />Project Manager & Design Engineer: As a prime component of the East-West Conveyance Drainage Project, CAS <br />was tasked with improving the hydraulic efficiency of the Whidden Ditch through canal improvements at strategic <br />locations in order to provide food protection for the area and reduce canal maintenance. The scope of work <br />included surveying of the project area including preparation of conveyance/maintenance easements for all <br />identified conveyances, a detailed stormwater modeling analysis, preparation of a conceptual plan with phasing <br />and a final engineering report. Total cost for survey, hydraulic analysis, conceptual design, and final engineering <br />report was $138,360. The project began in July 2015 and was completed on time in April 2017. <br />(1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED <br />Oak Park Subdivision Stormwater Improvements PROFESSIONAL CONSTRUCTION (If <br />Okeechobee County, Florida SERVICES Aoolica ble J <br />2015 2016 g 3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with <br />current firm <br />Project Manager & Design Engineer: CAS was tasked to design and construct stormwater improvements for the <br />Oak Park Residential Subdivision entailing approximately 90 homes in order to improve local drainage. Total <br />design costs for the project improvements including construction manageme nt was $166,938. The initial <br />construction cost was $914,589 with County requested change orders totaling $1,353,913 for additional <br />stormwater improvements for a total construction cost of $2,268,502. The project began in April 9, 2015 and was <br />completed in March 17, 2016 without liquidated damages. <br />(1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED <br />Airport Ditch Improvements PROFESSIONAL CONSTRUCTION (If <br />Okeechobee County, Florida SERVICES Aon/icable) <br />2014 2014 h 3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with <br />current firm <br />Project Manager & Design Engineer: The Airport Ditch Improvements Project for Okeechobee County consists of <br />bank stabilization, re-shaping, sodding of canal washouts, easement and right-of-way issues. This NRCS project <br />was a 75/25 match that involved debris removal from rip-rap rock bank stabilization to prevent erosion due to <br />Tropical Storm Isaac. Total design costs for the project was $25,000. Total construction cost was $500,000. The <br />project began in January 2014 and was completed in March 2014 on time and without liquidated damages.
The URL can be used to link to this page
Your browser does not support the video tag.