My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith & Associates
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craig A. Smith & Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:39:59 AM
Creation date
8/21/2020 11:38:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Craig A. Smith & Associates, Inc. <br />Engineers • Surveyors • Subsurface Utility Engineering <br />30 Subsurface Imaging • Utility Coordination <br />SECTION D1 -PROJECT <br />APPROACH AND <br />UNDERSTANDING <br />GENERAL PROJECT APPROACH <br />CAS utilizes a phased approach towards assisting the City in problem solving and for implementation <br />of assigned projects. Our general project approach is as follows: <br />PHASE I -PROJECT DEVELOPMENT AND PLANNING <br />•Meeting with City Staff to develop the <br />project scope (for each work <br />authorization as assigned} <br />•Develop a fee proposal to match the <br />project scope as per established fee <br />schedule <br />•Finalize the scope and proceed with a <br />kickoff meeting with the City Staff <br />•Perform Pre-Design Field Condition <br />Assessment <br />•Develop Project Prioritization and <br />Phasing (as needed} <br />•Conduct Modeling/Feasibility Studies & <br />Reports (as needed) <br />•Provide Grant Funding <br />Assistance/Admin istration (as needed} <br />•Finalize Design Criteria <br />•Prepare preliminary (conceptual) <br />engineering design/plans <br />•Outline specifications <br />•Prepare preliminary construction cost <br />estimate <br />•Public Involvement/Community <br />Outreach (as needed) <br />CAS shall develop project scope, prioritize and phase design work for projects in a manner that will avoid <br />schedule conflicts and allow for an efficient flow of work. CAS believes a high level of consistent <br />communication will be essential in providing a successful completion of the assigned projects. Our <br />management team will maintain a high level of communication with continuous accessibility to CAS <br />staff and all other team members (sub-consultants). The CAS Team's goal is to seamlessly operate as <br />an extension to City staff to satisfactorily complete projects on time and on or under budget. <br />21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmlth.com • LB3110
The URL can be used to link to this page
Your browser does not support the video tag.