Laserfiche WebLink
I. (1)TITLE AND LOCATION (City and State)(2} YEAR COMPLETED <br />Wauchula Hills Water and Sanitary Sewer Improvements -PROFESSIONAL CONSTRUCTION (if Phase V SERVICES aoolicable) Wauchula, Florida 2017 Onaoing <br />(3)BRIEF DESCRIPTION (scooe, size, cost, etc.} and SPECIFIC ROLE X Check if project performed with current firm <br />Project Manager: CAS is providing professional engineering services for the installation of approximately 6,885 <br />linear feet of 8" water main including fire hydrants, one duplex submersible wastewater lift station, approximately <br />1,500 linear feet of 4" force main and approximately 6,750 linear feet of 8" gravity sanitary sewer. This project is <br />funded through a multi-year special legislative appropriation. The project design is currently 95% complete. The <br />project design costs, including construction management, are $121,453. Construction began on October 15, 2019 <br />and is on-going (currently approximately 40% complete). The project construction cost is $2,068,956.