My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith & Associates
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craig A. Smith & Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:39:59 AM
Creation date
8/21/2020 11:38:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. (1)TITLE AND LOCATION (City and State)(2} YEAR COMPLETED <br />Wauchula Hills Water and Sanitary Sewer Improvements -PROFESSIONAL CONSTRUCTION (if Phase V SERVICES aoolicable) Wauchula, Florida 2017 Onaoing <br />(3)BRIEF DESCRIPTION (scooe, size, cost, etc.} and SPECIFIC ROLE X Check if project performed with current firm <br />Project Manager: CAS is providing professional engineering services for the installation of approximately 6,885 <br />linear feet of 8" water main including fire hydrants, one duplex submersible wastewater lift station, approximately <br />1,500 linear feet of 4" force main and approximately 6,750 linear feet of 8" gravity sanitary sewer. This project is <br />funded through a multi-year special legislative appropriation. The project design is currently 95% complete. The <br />project design costs, including construction management, are $121,453. Construction began on October 15, 2019 <br />and is on-going (currently approximately 40% complete). The project construction cost is $2,068,956.
The URL can be used to link to this page
Your browser does not support the video tag.