My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith & Associates
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craig A. Smith & Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:39:59 AM
Creation date
8/21/2020 11:38:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br />12.NAME <br />Keith Schriner <br />13.ROLE IN THIS CONTRACT <br />Project/Field Engineer <br />14.YEARS EXPERIENCE <br />a.TOT AL b.WITH CURRENT <br />FIRM 4 4 <br />15.FIRM NAME AND LOCATION (City and State) <br />Craig A. Smith and Associates, Inc. <br />Boca Raton, Florida <br />16.EDUCATION (DEGREE AND SPECIALIZATION) <br />Bachelor of Science, Civil Engineering, 2013 <br />University of Central Florida, Orlando, Florida <br />17.CURRENTLY PROFESSIONAL <br />REGISTRATION (STATE AND DISCIPLINE) <br />18.OTHER PROFESSIONAL QUALIFICATIONS Publications, Or anization, Trainin , Awards, etc. <br />a. <br />19.RELEVANT PROJECTS <br />(1) TITLE AND LOCATION (City and State) <br />2018 Watermain Improvements -Phase II <br />Margate, Florida <br />2 YEAR COMPLETED <br />PROFESSIONAL CONSTRUCTION (if <br />SERVICES a licable <br />2019 <br />3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE x Check if pro·ect performed with current firm <br />Project Engineer: Responsible for the design, preparation of construction plans and contract documents, <br />permitting, bidding, construction management and limited construction observation through project close out/start <br />up services for the replacement of 2" galvanized steel water mains with 6" DIP water mains at fifteen (15) different <br />locations throughout the city's service area (approximately 12,000 LF) including GPR utility locates, test hole <br />investigations, water service line placements, ACP removal, fire hydrant replacement, fire hydrant spacing <br />analysis and valve shutdown plan. Design cost $212,280. Construction cost $1,497.921. <br />b.(1) TITLE AND LOCATION (City and State)2 YEAR COMPLETED <br />Spring Lake Improvement District -WWTP and wastewater PROFESSIONAL CONSTRUCTION (if <br />System Improvements SERVICES a licable <br />Sebring, Florida 2017 2019 <br />3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE X Check if pro·ect performed with current firm <br />Project Engineer: Responsible for the design for the construction of an 80,000 GPO extended aeration activated <br />sludge wastewater treatment plan with absorption bed effluent disposal system including a sanitary sewer lift <br />station and an 8" / 1 O" forcemain to the new WWTP site. Project includes survey, utility locates, geotechnical <br />investigation, environmental assessment permitting, contract document development, bidding assistance, <br />construction management and inspection through project closeout (project is 100% SRF funded). Design and <br />construction management cost $450,510. Construction cost is $2,8000,000. <br />c.(1) TITLE AND LOCATION (City and State) <br />SW 28th Street and 3 rd Terrace Roadway <br />Okeechobee County, Florida <br />2 YEAR COMPLETED <br />PROFESSIONAL CONS TRUCTION (if <br />SERVICES a licable <br />2016 2018 <br />3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE x Check if pro·ect performed with current firm <br />Project Engineer: This particular area of Okeechobee experienced noticeable roadway settlement at fourteen <br />locations along an existing gravity storm system. Custom construction details were produced to clearly define the <br />scope for each trench restoration area. A valley gutter was also installed in swales to allow runoff to flow into <br />existing inlets and keep water from ponding on driveways. Construction cost $400,000.
The URL can be used to link to this page
Your browser does not support the video tag.