My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith & Associates
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craig A. Smith & Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:39:59 AM
Creation date
8/21/2020 11:38:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d.(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Wauchula Hills Phase 4.0 Water and Sewer Improvements PROFESSIONAL CONSTRUCTION (if Hardee County, Florida SERVICES aoolicable) <br />2016 2017 <br />(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm <br />Project Engineer: Wauchula Hills is a very old neighborhood with residences on both well and septic tanks, <br />eventually resulting in high levels of groundwater contamination. The scope of this project includes designing a <br />gravity sewer collection system to tie into an exiting system and expanding on an existing water main system to <br />service the rest of the neighborhood. Construction cost is $1,249,012. <br />e. (1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED <br />Avenue L, M, Mand 4th Street Gravity Sanitary Sewer,PROFESSIONAL CONSTRUCTION (if Forcemain and Lift Station Improvements SERVICES applicable) <br />2015 2016 <br />(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm <br />Project Engineer: Construction of duplex submersible lift station with an 8 foot diameter wet well and approx .. 350 <br />LF of 6" forcemain along with 6,344 LF of associated 8" and 1 O" gravity sewer line. Services included survey, <br />design, permitting, preparation of construction plans and contract documents, bidding and construction <br />management. Construction cost is $1,286,627.
The URL can be used to link to this page
Your browser does not support the video tag.