Laserfiche WebLink
• <br />E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key pe, son.) <br />12.NAME 13.ROLE IN THIS CONTRACT <br />Engi neering -Project Engineer <br />14.YEARS EXP ERIENCE <br />Al Caruso, E.I.a.TOTAL <br />28 <br />b.WITH CURRENT <br />FIRM <br />21 <br />15.FIRM NAME AND LOCATION (City and State) <br />Craig A. Smith & Associates, Inc. <br />Boca Raton, Florida <br />16.EDUCATION (DEGREE AND SPECIALIZATION) <br />Associates Degree in Engineering, 1978 <br />17.CURRENT PROFESSIONAL REGISTRATION (STATE AND <br />DISCIPLINE) <br />Technology Middlesex County College, New Jersey <br />18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />19.RELEVANT PROJECTS <br />1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED <br />Wastewater Pump Station No. 3 & Gravity Sewer PROFESSIONAL CONSTRUCTION (If <br />Bal Harbour, Florida SERVICES Applicable) <br />2017 2018 <br />a 3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />k:urrent firm <br />X Check if project performed with <br />Project Designer: Construction of new triplex submersible pump station with 12-foot diameter wet well, control panel, <br />automatic transfer switch receptacle, on-site emergency generator, electrical upgrades and all associated appurtenances and <br />approximately 1,350 linear feet of 18-inch gravity sewer lines to pump station. Services include survey, utility locates, design, <br />permitting, preparation of construction plans and contract documents, bidding, and construction management. (Responsible <br />for the desian of the aravitv sewer lines.} Construction cost $2,968,730 <br />1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED <br />Sewer Force Main Replacement PROFESSIONAL CONSTRUCTION (If <br />Margate, Florida SERVICES Aoolicab/el <br />2013 2014 <br />3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current <br />Irm <br />Project Designer: Replacement of an existing 12-inch ACP force main with a new, upsized sewer force main. The work <br />included the installation of approximately 5,060 LF of DIP force main ranging in size from 6-inch to 20-inch, 140 LF of <br />encased jack and bored pipe under State Road 7, 950 LF of directional drilled HOPE pipe under an existing canal, connection <br />to an existing lift station, abandonment of the existing force main, and road and swale restoration. The project was installed <br />from the City's wastewater treatment plant to an existina force main tie-in on State Road 7. Project cost $1,449,900 <br />1)TITLE AND LOCATION (City and State)(2} YEAR COMPLETED <br />Collins Avenue 12" Water Main Replacement PROFESSIONAL CONSTRUCTION (If <br />Bal Harbour, Florida SERVICES Aoolicable) <br />2011 2013 <br />C 3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with <br />current firm <br />Project Designer: Responsible for design, permitting, contract document development, bidding services, construction <br />management/inspection and certification through project close-out for installation of 1 ,800 linear feet of horizontal directionally <br />drilled 12" HOPE water main and 680 linear feet of 12" DIP water main including five (5) fire hydrants and nine (9) tie-in <br />connections to existinQ water mains. Construction cost $558,590 <br />I i <br />'