<br />E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key pe, son.)
<br />12.NAME 13.ROLE IN THIS CONTRACT
<br />Engi neering -Project Engineer
<br />14.YEARS EXP ERIENCE
<br />Al Caruso, E.I.a.TOTAL
<br />28
<br />b.WITH CURRENT
<br />FIRM
<br />21
<br />15.FIRM NAME AND LOCATION (City and State)
<br />Craig A. Smith & Associates, Inc.
<br />Boca Raton, Florida
<br />16.EDUCATION (DEGREE AND SPECIALIZATION)
<br />Associates Degree in Engineering, 1978
<br />17.CURRENT PROFESSIONAL REGISTRATION (STATE AND
<br />DISCIPLINE)
<br />Technology Middlesex County College, New Jersey
<br />18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />19.RELEVANT PROJECTS
<br />1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
<br />Wastewater Pump Station No. 3 & Gravity Sewer PROFESSIONAL CONSTRUCTION (If
<br />Bal Harbour, Florida SERVICES Applicable)
<br />2017 2018
<br />a 3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br />k:urrent firm
<br />X Check if project performed with
<br />Project Designer: Construction of new triplex submersible pump station with 12-foot diameter wet well, control panel,
<br />automatic transfer switch receptacle, on-site emergency generator, electrical upgrades and all associated appurtenances and
<br />approximately 1,350 linear feet of 18-inch gravity sewer lines to pump station. Services include survey, utility locates, design,
<br />permitting, preparation of construction plans and contract documents, bidding, and construction management. (Responsible
<br />for the desian of the aravitv sewer lines.} Construction cost $2,968,730
<br />1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
<br />Sewer Force Main Replacement PROFESSIONAL CONSTRUCTION (If
<br />Margate, Florida SERVICES Aoolicab/el
<br />2013 2014
<br />3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current
<br />Irm
<br />Project Designer: Replacement of an existing 12-inch ACP force main with a new, upsized sewer force main. The work
<br />included the installation of approximately 5,060 LF of DIP force main ranging in size from 6-inch to 20-inch, 140 LF of
<br />encased jack and bored pipe under State Road 7, 950 LF of directional drilled HOPE pipe under an existing canal, connection
<br />to an existing lift station, abandonment of the existing force main, and road and swale restoration. The project was installed
<br />from the City's wastewater treatment plant to an existina force main tie-in on State Road 7. Project cost $1,449,900
<br />1)TITLE AND LOCATION (City and State)(2} YEAR COMPLETED
<br />Collins Avenue 12" Water Main Replacement PROFESSIONAL CONSTRUCTION (If
<br />Bal Harbour, Florida SERVICES Aoolicable)
<br />2011 2013
<br />C 3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with
<br />current firm
<br />Project Designer: Responsible for design, permitting, contract document development, bidding services, construction
<br />management/inspection and certification through project close-out for installation of 1 ,800 linear feet of horizontal directionally
<br />drilled 12" HOPE water main and 680 linear feet of 12" DIP water main including five (5) fire hydrants and nine (9) tie-in
<br />connections to existinQ water mains. Construction cost $558,590
<br />I i
<br />'
|