My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith & Associates
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craig A. Smith & Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:39:59 AM
Creation date
8/21/2020 11:38:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED I <br />Bal Harbour Force Main Replacement PROFESSIONAL CONSTRUCTION (If <br />Bal Harbour, Florida SERVICES Applicable) : <br />2010 2011 <br />d 3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />urrent firm <br />X Check if project performed with <br />Project Designer: Planning, design, permitting, preparation of construction plans, bidding and construction management of <br />12,000 linear feet of 16" force main trunk line to service the entire Village to pump all raw sewage to Miami Beach. Services <br />included survey, utility locates, design, permitting, cost estimates, bidding, construction management, community outreach <br />and survev as-builts. Proiect cost $842,570 <br />1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED [ <br />Capital Improvements Project-Phase Il l-IV PROFESSIONAL CONSTRUCTION (If I <br />Golden Beach, Florida SERVICES ADDlicable) <br />2010 2011 <br />e 3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with <br />1,,urrent firm <br />Project Designer: Construction of submersible stormwater master pump station and approximately 14 ,500 linear feet of <br />I drainage pipe and force main. Project cost $7,667,276 <br />1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED <br />Palm & Hibiscus Islands Stormwater & Roadway Improvements PROFESSIONAL CONSTRUCTION (If <br />Miami Beach, Florida SERVICES Aoolicablel <br />2014 2018 <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current <br />�rm <br />Design engineering for a capital improvement project on Hibiscus Island including drainage system, buried utilities, roadway <br />design and harmonization to existing residences. Construction costs total $3.7 million.
The URL can be used to link to this page
Your browser does not support the video tag.