My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith & Associates
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craig A. Smith & Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:39:59 AM
Creation date
8/21/2020 11:38:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br />12.NAME <br />Frank Vilar, P.E. <br />13.ROLE IN THIS CONTRACT <br />Project Engineer -Stormwater <br />14.YEARS EXPERIENCE <br />a.TOTAL b.WITH CURRENT <br />FIRM <br />25 5 <br />15.FIRM NAME AND LOCATION (City and State) <br />Craig A. Smith and Associates, Inc. <br />Boca Raton, Florida <br />16.EDUCATION (DEGREE AND SPECIALIZATION)17.CURRENTLY PROFESSIONAL <br />REGISTRATION (STATE AND DISCIPLINE) <br />Professional Engineer <br />M.S. Environmental Engin eering, Florida International University <br />B.S. Civil Engineering, Florida International UniversityA.A., Miami-Dade College State of FloridaLicense No. 55459 <br />18.OTHER PROFESSIONAL QUALIFICATIONS Publications, Or anization, Trainin , Awards, etc. <br />19.RELEVANT PROJECTS <br />a.(1) TITLE AND LOCATION (City and State)2 YEAR COMPLETED <br />Lake Osborne Estates Water Main Improvements <br />Lake Worth, Florida <br />PROFESSIONAL CONSTRUCTION (if <br />SERVICES a licable <br />On oin <br />(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with <br />current firm <br />Engineering design for proposed Phase I of Lake Osborne Estates serving 228 residences. Appr oximately 16,400 <br />LF of water main installation ranging in size from 4" to 8" is proposed, including relocation of backyard water <br />services to the front of properties. Design costs total $183,747 and construction costs total $2,618,649. <br />b.(1) TITLE AND LOCATION (City and State)2 YEAR COMPLETED <br />C. <br />Non Sewer Area C: Sanitary Sewer Improvements <br />Pompano Beach, Florida <br />PROFESSIONAL CONSTRUCTION (if <br />SERVICES a licable <br />On oin <br />(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with <br />current firm <br />CAS is providing engineering design services for the installation of a new wastewater collection system to provide <br />sanitary sewer service to the city's Non-Sewer Area C service area. The project area consists of 38 <br />commercial/light industrial properties which are currently on septic tanks. CAS conducted a Sanitary Sewer <br />Service Study for the city to identify design solutions. The recommendations from the study deter mined that the <br />new system shall consist of one wastewater lift station along with associated gravity sewer and force main lines <br />and include connections to two (2) existing city wastewater lift stations. Design fees for this project are $198,803. <br />The construction cost estimate is $1,800,000. <br />2 YEAR COMPLETED (1)TITLE AND LOCATION (City and State) <br />SW 2 nd Stre et Drainage Improvements <br />Pompano Beach, Florida <br />PROFESSIONAL CONSTRUCTION (if <br />(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE <br />current firm <br />SERVICES a licable <br />X Check if project perf ormed with <br />Engineering design for proposed drainage improvements of SW 2 nd Street, SW 1st Avenue and SW 1st Terrace. <br />Design costs total $143,833 and estimated construction costs total $750,000.
The URL can be used to link to this page
Your browser does not support the video tag.