My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith & Associates
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craig A. Smith & Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:39:59 AM
Creation date
8/21/2020 11:38:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED <br />NW 16th Lane Drainage Improvements PROFESSIONAL CONSTRUCTION (if <br />Pompano Beach, Florida SERVICES aoolicable) <br />Ongoing Onqoina <br />(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with <br />current firm <br />providing engineering design services including route survey and utility locates for the drainage improvements along <br />the NW 16th Lane area which includes the road right-of-way and 16 property lots encompassing approximately a <br />total of 10 acres. The project area is composed of primarily light industrial and warehouse properties. CAS will <br />perform a drainage analysis to determine the feasibility of proposed site improvements for conf ormance with established <br />drainage criteria. The drainage analysis will include pipe sizing analysis, flood routing design and will incorporate water <br />quality treatment measures in the design in accordance with the City's Stormwater Master Plan. Design elements <br />include drainage pipes, includes paving, grading, drainage and stormwater pump station improvements. Design fees <br />for this project are $161,136. The construction cost estimate is $900,000. <br />e.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED <br />US 1 and NE 14th Street Drainage Improvements PROFESSIONAL CONSTRUCTION (if <br />Pompano Beach, Florida SERVICES aoolicable) <br />Onqoina Onaoina <br />(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with <br />current firm <br />CAS is providing engineering design services for the drainage improvements for the US-1 and NE 14th Street <br />Causeway area encompassing a neighborhood area of approximately 60 acres. The project area is composed of <br />primarily residential homes with some commerci al develo pment within the project limits. CAS was directed to <br />evaluate options available for providing drainage improvements for the area with the goal of addressing flooding <br />and water quality treatment to the greatest extent practical. The proposed alternatives will examine the feasibility <br />of exfiltration trench, improved pipe conveyance and swale improvements where feasible. Proposed improvements <br />will use existing city-owned outfall systems within the project area where feasible and evaluate upsizing these <br />systems. Design fees for this project are $196,069. The construction cost estimate is $1,626,000 <br />f.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED <br />Glades Roadway and Drainage Improvements, Bank of PROFESSIONAL CONSTRUCTION (if <br />America SERVICES applicable) <br />Boca Raton, Florida 2016 2019 <br />(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with <br />current firm <br />Redevelopment of a 4.7 acre existing bank site. Services provided included engineering design of a 200 linear <br />foot water main relocation, paving, grading and drainage improvements. Permitting, construction management <br />and inspection services were also provided. Construction costs for the civil related improvements were $575,000.
The URL can be used to link to this page
Your browser does not support the video tag.