My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith & Associates
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craig A. Smith & Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:39:59 AM
Creation date
8/21/2020 11:38:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br />12.NAME 13.ROLE IN THIS CONTRACT <br />Vice President -Surveying <br />14.YEARS EXPERIENCE <br />Robert D. Keener, <br />PSM <br />a.TOT AL b.WITH CURRENT <br />FIRM <br />42 25 <br />15.FIRM NAME AND LOCATION (City and State) <br />Craig A. Smith and Associates, Inc. <br />-_,___.._ ,_ .. ·--------.--... t--.. - <br /> <br />. <br />, <br />. <br />_ <br /> <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />Boca Raton, Florida <br />� .............. <br />16.EDUCATION (DEGREE AND SPECIALIZATION) <br />Associate of Arts Degree <br />17.CURRENTLY PROFESSIONAL <br />REGISTRATION (STATE AND DISCIPLINE) <br />Florida Land SurveyorContinuing Education in Land Surveying <br />Re istration No, 4846 <br />19.RELEVANT PROJECTS <br />a.(1) TITLE AND LOCATION (City and State)2 YEAR COMPLETED <br />b. <br />C. <br />East-West Conveyance Drainage Project (Whidden Ditch) <br />Okeechobee County, Florida <br />PROFESSIONAL CONSTRUCTION (if <br />SERVICES a licable <br />2015-2017 N/A <br />3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE x Check if pro·ect performed with current firm <br />As a prime component of the east-west conveyance drainage project, CAS was tasked with improving the hydraulic <br />efficiency of the Whidden Ditch through canal improvements at strategic locations in order to provide food protection <br />for the area and reduce canal maintenance. The scope of work included surveying of the project area including <br />preparation of conveyance/maintenance easements for all identified conveyances, a detailed stormwater modeling <br />analysis, preparation of a conceptual plan with phasing and a final engineering report. Total cost for survey, <br />h draulic anal sis, conce tual desi n and final en ineerin re ort was $138,360. <br />(1) TITLE AND LOCATION (City and State) 2 YEAR COMPLETED <br />City of Pompano Beach PROFESSIONAL CONSTRUCTION (if <br />SW 2nd Street Drainage Improvements SERVICES a licable <br />Pompano Beach, Florida 2018 <br />3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE x Check if pro·ect performed with current firm <br />Route survey including all above ground features within existing right-of-way and off-site surveying of critical <br />drainage structures. Scope of work includes 2D GPR utility locates within the project corridor (SW 2nd street <br />between dixie highway and cypress road, SW 1st Avenue between SW 2nd street and Atlantic Boulevard, and SW <br />1st terrace & court between SW 2nd street and south cypress road ). <br />COST: $22,300 <br />(1)TITLE AND LOCATION (City and State) <br />City of Lake Worth Beach <br />Lake Osborne Estates Water Main Replacement and <br />Expansion Phase 1 <br />Lake Worth, Florida <br />2 YEAR COMPLETED <br />PROFESSIONAL CONSTRUCTION (if <br />SERVICES a licable <br />2018 & 2020 Ongoing <br />3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE X Check if ro·ect performed with current firm <br />Route survey along residential streets throughout community for 228 properties, including all visible <br />improvements, above and below ground utilities, drainage structures as well as trees and landscaped areas 1 O <br />feet outside right of way, property lines, utility easements and subsurface utility engineering (utility locates). <br />Owner initiated change order in the amount of $17,990 for additional scope of work to include surveying and utility <br />locates for approximately 40 additional properties as part of the Phase 1 expansion. <br />COST: $127.153
The URL can be used to link to this page
Your browser does not support the video tag.