My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith & Associates
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craig A. Smith & Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:39:59 AM
Creation date
8/21/2020 11:38:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d.(1) TITLE AND LOCATION (City and State)(2} YEAR COMPLETED <br />City of Delray Beach PROFESS IONAL CONSTRUCTION (if <br />Lowson Boulevard Improvements SERVICES applicable) <br />Delray Beach, Florida 2019 N/A <br />(3)BRIEF DESCRIPTION (scope, size, cost, etc.} and SPECIFIC ROLE X Check if project performed with current firm <br />CAS performed survey and subsurface utility engineering as a subconsultant to Kimley-Horn & Associates, Inc. for <br />the City of Delray Beach. The scope of work included a survey of all above ground visible improvements and <br />utilities within the right-of-way of Lowson Boulevard (SW 10th Street) and 10 feet beyond the right-of-way line from <br />the east right-of-way of Congress Avenue to the intersection of SE 6th Avenue. In addition, rims, pipe invert <br />elevations, sizes and pipe materials were acquired for all existing drainage structures within the project limits. <br />Subsurface utility engineering included soft digs at fifty (50) designated locations to verify depths , sizes and <br />materials of conflicting buried utilities. Cost $58,550 <br />e.(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Palm Beach County Water Utilities Department PROFESSIONAL CONSTRUCTION (if <br />Lyons Road Forcemain Replacement -Phase II SERVICES aoolicable) <br />2018 N/A <br />(3)BRIEF DESCRIPTION (scope, size, cost, etc.} and SPECIFIC ROLE X Check if project performed with current firm <br />Route survey and utility locates within existing right-of-way. <br />COST: $12,750. <br />f.(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />City of Margate 2018 Water Main Improvements PROFESSIONAL CONSTRUCTION (if <br />Margate, Florida SERVICES applicable) <br />2016 Onooino <br />(3)BRIEF DESCRIPTION (scope, size, cost, etc.} and SPECIFIC ROLE X Check if project performed with current firm <br />Route survey including location of all above ground features and visible improvements within the existing right-of- <br />way. Establish survey baseline, cross sections and vacuum excavation test holes to verify location of buried <br />utilities. <br />COST: $46,250. <br />g.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED <br />Seacoast Utility Authority -Northlake Boulevard/US1 Water PROFESSIONAL CONSTRUCTION (if <br />and Sewer force Main Replacement SERVICES aoolicable) <br />Jupiter , Florida 2018 N/A <br />(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPEC IFIC ROLE X Check if project performed with current firm <br />Route survey along Northlake Boulevard and US-1 (approx. 2.8 miles) including identification of right-or-way, <br />property lines, above ground improvements, utility easements, tee survey, cross sections and subsu rface utility <br />engineering (utility locates). <br />Cost $203,325. <br />h.(1) TITLE AND LOCATION (City and State)(2} YEAR COMPLETED <br />Village of Bal Harbour PROFESSIONAL CONSTRUCTION (if <br />Bal Harbour, Florida SERVICES applicable} <br />2016 N/A <br />(3)BRIEF DESCRIPTION (scooe, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm <br />Various survey mapping and construction projects for the expansion and/ or rehabilitation of utilities, acting as the <br />village engineers. Projects include Collins Ave. (SR A-1-A) from 73rd street to 96th street and 96 th street to the <br />Haulover cut (approximately three (3) miles). Also included is ongoing surveying as needed and a major route <br />survey for the rehabilitation of the Vi llage of Bal Harbour utility system and roadways. (approximately three (3) <br />miles). <br />Cost: $22,000.
The URL can be used to link to this page
Your browser does not support the video tag.