Laserfiche WebLink
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br />12.NAME <br />Michael Marenco <br />13.ROLE IN THIS CONTRACT <br />CADD Operations Manager <br />15.FIRM NAME AND LOCATION (City and State) <br />Craig A. Smith and Associates, Inc. <br />Boca Raton, Florida <br />16.EDUCATION (DEGREE AND SPECIALIZATION) <br />Sheridan Technical <br />14.YEARS EXPERIENCE <br />a.TOT AL b. WITH CURRENT <br />FIRM <br />15 15 <br />17.CURRENTLY PROF ESSIONAL <br />REGISTRATION {STATE AND DISCIPLINE) <br />18.OTHER PROFESSIONAL QUALIFICATIONS (Pub lications, Organization, Training, Awards, etc.) <br />Architectural Draftsman in AutoCAD <br />Civil Draftsman in Au toCAD <br />Survey Draftsman in AutoCAD <br />a. <br />19.RELEVANT PROJECTS <br />(1)TITLE AND LOCATION (City and State) <br />Village of Bal Harbour <br />Bal Harbour, Florida <br />2 YEAR COMPLETED <br />PROFESSIONAL CONSTRUCTION (if <br />SERVICES a licable <br />2015 2017 <br />3 BRIEF DESCRIPTION sea e, size, cost, etc. and SPECIFIC ROLE x Check if pro·ect erformed with current firm <br />The creation of specific purpose survey as well as plan and profile civil engineering design plans and an updated <br />survey record as-built for a newer gravity sewer system and triplex submersible wastewater pump station. <br />b.(1) TITLE AND LOCATION (City and State) <br />Village of Bal Harbour 2 YEAR COMPLETED <br />PROFESSIONAL CONSTRUCTION (if Bal Harbour, Florida SERVICES a licable <br />2011 2013 <br />3 BRIEF DESCRIPTION sea e, size, cost, etc. and SPECIFIC ROLE x Check if pro·ect performed with current firm <br />The creation of specific purpose survey along with the plan and profile civil engineering design plans and a record <br />as-built for newer water main system. <br />c.(1) TITLE AND LOCATION (City and State) <br />Stormwater Master Plan <br />Town of Golden Beach, Florida <br />2 YEAR COMPLETED <br />PROFESSIONAL CONST RUCTION (if <br />SERVICES a licable <br />2001-2003 NIA <br />3 BRIEF DESCRIPTION sea e, size, cost, etc. and SPECIFIC ROLE X Check if pro·ect performed with current firm <br />The creation of specific purpose survey as well as the digital and hard copy plan and profile civil engineering plans <br />and updated record as-builts as part of a design team for a collaborative digital end product. <br />d.(1) TITLE AND LOCATION (City and State) <br />Stormwater Multiple Phase Improvements <br />City of Sweetwater, Florida <br />2 YEAR COMPLETED <br />PROFESSIONAL CONST RUCTION {if <br />SERVICES a licable <br />1998-2011 2000-2014 <br />3 BRIEF DESCRIPTION sea e, size, cost, etc. and SPECIFIC ROLE x Check if pro·ect performed with current firm <br />The creation of specific purpose survey as well as plan and profile civil engineering design plans and a record as­ <br />built for newer stormwater drainage system.