My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith & Associates
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craig A. Smith & Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:39:59 AM
Creation date
8/21/2020 11:38:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I 1) TITLE ANO LOCATION {CITY AND STA TE:) (2) YEAR COMP LETEDBROWARD COUNTY ENGINEERING PROFESSIONAL SERVICES CONSTRUCTION (IF APPLICABLE) <br />WILES ROAD IMPROVEMENTS 2019 NIA <br />c.BROWARD COUNTY FLORIDA <br />3) BRIEF DESCRIPTION (brief scope, size, cost, etc.) ANO SPECIFIC ROLE x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br />PERFORMED SUBSURFACE UTILITY ENGINEERING USING GRP & 100 VACUUM EXCAVATIONS ON EXISTING BURIED UTILITIES FOR <br />PAVING AND DRAINAGE IMPROVEMENTS. <br />COST $54,000 <br />I 1) TITLE ANO LOCATION {CITY AND STA TE:) 12\ YEAR COMPLETED CITY OF MIAMI BEACH PROFESSIONAL SERVICES CONSTRUC TION (IF APPLICABLE <br />LIGHT RAIUMODERN STREETCAR PROJECT SURVEYING AND MAPPING <br />2016 NIA <br />e. MIAMI BEACH, FLORIDA <br />3) BRIEF DESCRIPTION (brief scope, size, cost, etc.) ANO SPECIFIC ROLE x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br />MAP OF TOPOGRAPHIC SURVEY/ROUTE SURVEYS ADHERING TO THE MIAMI BEACH PUBLIC WORKS MANUAL -SECTION 1A - <br />SURVEYING STANDARDS AND REQUIREMENTS ALONG THE CORRIDORS. ALL VISIBLE IMPROVEMENTS WERE LOCATED AND <br />SHOWN. ABOVE AND BELOW GROUND UTILITIES AND DRAINAGE WERE IDENTIFIED AS WELL AS TREES AND LANDSCAPED <br />AREAS TO 25 FEET OUTSIDE EACH RIGHT OF WAY LINE. CROSS-SECTIONS WERE TAKEN AT 50-FOOT INTERVALS. ELEVATIONS <br />AT ENTRY THRESHOLDS OF STRUCTURES WERE ALSO PROVIDED. <br />COST: $300,000(+) <br />I 1) TITLE AND LOCATION (CITY AND STA TE:) 12)YEAR COMPLETEDTOWN OF DAVIE UTILITIES PROFESSIONAL SERVICES CONSTRUCTION (IF APPLICABLE) <br />f. BROWARD COUNTY, FLORIDA ONGOING NIA <br />3) BRIEF DESCRIPTION (brief scope, size, cost, etc.) ANO SPECIFIC ROLE x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM I COMP LETE RESPONSIBILITY FOR PROVIDING ONE CALL UTILITY LOCATES FOR CITY OWNED WATER, SEWER, RECLAIM, <br />STREETS LIGHTS AND MONIR POWER FACILITIES. <br />COST: $150,000+ANNUALLY <br />I 1) TITLE ANO LOCATION {CITY AND STA TE:) 12) YEAR COMPLETED UNITED STATES NAVY PROFESSIONAL SERVICES CONSTRUCTION (IF APPLICABLE) <br />h. NAVAL AIR STATION KEY WEST 2018 NIA <br />MONROE COUNTY, FLORIDA <br />3) BRIEF DESCRIPTION {brief scope, size, cost, etc.) ANO SPECIFIC ROLE x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br />COMP LETE RESPONSIBILITY FOR ALL UTILITY LOCATES AND SUBSURFACE UTILITY ENGINEERING FOR US NAVY FACILITIES AT <br />ALL BASE AREAS AND ANNEXES IN AND AROUND NAVAL AIR STATION KEY WEST INCLUDING, WATER, SEWER, RECLAIM, BRINE, <br />FIBER OPTIC, ALL ELECTRIC (PRIMARY, FEEDER, SECONDARY & SERVICE LINES), STREET LIGHTING, SCADA, AND SECURE <br />COMMUNICATION LINES <br />COST: $75,000+ANNUALL Y <br />1) TITLE AND LOCATION {CITY AND STATE:) /2l YEAR COMPLETED PALM BEACH COUNTY WATER UTILITIES DEPARTMENT PROFESSIONAL SERVICES CONSTRUCTION (IF APPLICABLE <br />L VONS ROAD FORCE MAIN REPLACEMENT -PHASE II SURVEYING AND MAPPING <br />2018 NIA <br />i. 3) BRIEF DESCRIPTION {brief scope, size, cost, etc.) ANO SPECIFIC ROLE x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br />ROUTE SURVEY AND UTILITY LOCATES WITHIN EXISTING RIGHT-OF-WAY. <br />COST: $12,750
The URL can be used to link to this page
Your browser does not support the video tag.