Laserfiche WebLink
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br />12.NAME <br />Tony Gomes <br />13.ROLE IN THIS CONTRACT <br />Senior Field Representative <br />14.YEARS EXPERIENCE <br />a.TOT AL b.WITH CURRENT <br />FIRM <br />42 36 <br />15.FIRM NAME AND LOCATION (City and State) <br />Craig A. Smith and Associates, Inc. <br />Boca Raton, Florida <br />16.EDUCATION (DEGREE AND SPECIALIZATION) <br />A.A. Business Management <br />17.CURRENTLY PROFESSIONAL <br />REGISTRATION (STATE AND DISCIPLINE) <br />Universit of Massachusetts, Amherst <br />18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organization, Training, Awards, etc.) <br />Survey Courses -University of Miami <br />Licensure -As halt Plant Tech FOOT #R-1712, As halt Roadwa Tech FOOT #5659 <br />19.RELEVANT PROJECTS <br />a.(1) TITLE AND LOCATION (City and State) <br />Golden Beach Capital Improvement Project <br />Golden Beach, Florida <br />2 YEAR COMPLETED <br />PROFESSIONAL CONSTRUCTION (if <br />SERVICES a licable <br />b. <br />C. <br />2008 2012 <br />3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE x Check if project performed with current firm <br />Responsible for daily construction observation/inspection of $17 .5 million project including stormwater, water main, <br />electrical, pavement, sidewalk and landscaping improvements. <br />(1)TITLE AND LOCATION (City and State) <br />Sunshine Water Control District (SWCD) <br />West Outfall Canal Improvements <br />Coral Springs, Florida <br />2 YEAR COMPLETED <br />PROFESSIONAL CONSTRUCTION (if <br />SERVICES a licable <br />3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE X Check if pro·ect performed with current firm <br />Conceptual hydraulic modeling of a 2-mile primary canal of the SWCD. Phase 1 design, permitting, modeling, <br />bidding, community outreach, and construction management of the $3 million project. <br />(1)TITLE AND LOCATION (City and State) <br />Stormwater Ponds Bank Repairs <br />Walnut Creek Community Development District (WCDD) <br />Pembroke Pines, Florida <br />2 YEAR COMPLETED <br />PROFESSIONAL CONSTRUCTION (if <br />SERVICES a licable <br />3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE x Check if pro·ect performed with current firm <br />Responsible for daily construction observation/inspection of 18,216 linear feet of geofabric tubes, 103,000 plants <br />and 15,000 square yards of sod. Construction cost were $594,600.