My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith & Associates
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craig A. Smith & Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:39:59 AM
Creation date
8/21/2020 11:38:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d. (1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED <br />NE 174th Street Stormwater and Pavement Improvements PROFESSIONAL CONSTRUCTION (if <br />Sunny Isles Beach, Florida SERVICES aoolicable) <br />2014 2017 <br />(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm <br />Responsible for daily construction observation/inspection, pay applications and project closeout for the restoration <br />of 0.2 miles of roadway and drainage improvements. Construction costs totaled $2.14 million. <br />e. (1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED <br />Capital Improvement Project phase Ill & IV Stormwater PROFESSIONAL CONST RUCTION (if Collection System with Master Pump Station SE RVICES applicable) Golden Beach, Florida 2009 2011 <br />(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm <br />Responsible for daily construction observation/inspection of the stormwater improvements for Phases II and IV <br />consisting of a stormwater master pumping station with submersible pumps, 14,500 linear feet of DIP drainage <br />pipe and force main (ranging in size from 16" to 72"), 205 drainage structures and 7 outfalls. Design costs for the <br />oroiect were $1,263,240. Total construction costs were $7,667,276.
The URL can be used to link to this page
Your browser does not support the video tag.