Laserfiche WebLink
d. (1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED <br />NE 174th Street Stormwater and Pavement Improvements PROFESSIONAL CONSTRUCTION (if <br />Sunny Isles Beach, Florida SERVICES aoolicable) <br />2014 2017 <br />(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm <br />Responsible for daily construction observation/inspection, pay applications and project closeout for the restoration <br />of 0.2 miles of roadway and drainage improvements. Construction costs totaled $2.14 million. <br />e. (1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED <br />Capital Improvement Project phase Ill & IV Stormwater PROFESSIONAL CONST RUCTION (if Collection System with Master Pump Station SE RVICES applicable) Golden Beach, Florida 2009 2011 <br />(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm <br />Responsible for daily construction observation/inspection of the stormwater improvements for Phases II and IV <br />consisting of a stormwater master pumping station with submersible pumps, 14,500 linear feet of DIP drainage <br />pipe and force main (ranging in size from 16" to 72"), 205 drainage structures and 7 outfalls. Design costs for the <br />oroiect were $1,263,240. Total construction costs were $7,667,276.