My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith & Associates
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craig A. Smith & Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:39:59 AM
Creation date
8/21/2020 11:38:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S ' <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />0.EXAMPLE PROJECT KEY <br />NUMBER <br />4 <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />Wauchula Hills Water and Sanitary Sewer <br />Improvements Phase IV <br />Hardee County, Florida <br />PROFESSIONAL SERVICES <br />2017 <br />23.PROJECT OWNER'S INFORMATION <br />CONSTRUCTION (If applicable) <br />Ongoing <br />a. PROJECT OWNER b. POINT OF CONTACT <br />Park Winter <br />c. POINT OF CONTACT TELE PHONE NUMBER <br />Hardee County (863)773 3030 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, end cost) <br />CAS pro vided professional engineering services for the installation of the water and sanitary sewer improvements included <br />approximatel y 6,125 linear feet of 8" water main and 5,277 linear feet of 8" gravity sanitary sewer including connection to <br />51 private residences and the decommissioning of septic tanks and potable water wells. This project was funded through <br />a multi-year special legislative appropriation. The project design costs, including construction management, were $189,628 <br />and project construction costs totaled $1,249,013. Project construction began in March 2017 and was completed in <br />October 2017 on schedule and under budget by $417,948. <br />Preliminary planning, survey, design, permitting, preparation of construction plans and contract documents, assistance in <br />securing grant funding for project, bidding, cost estimates, construction management and construction observation through <br />project closeout. <br />25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3)ROLE <br />a.Craig A Smith &Boca Raton, Florida Prime <br />Associates, Inc. <br />(1) FIRM NAME (2)FIRM LOCATION (City and State) (3) ROLE <br />b. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3)ROLE <br />c. 277 <br />(277) <br />l
The URL can be used to link to this page
Your browser does not support the video tag.