My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith & Associates
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craig A. Smith & Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:39:59 AM
Creation date
8/21/2020 11:38:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TE AM'S 0. EXAM PLE PROJECT KEY <br />NUMBER QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 70 projects, if not specifted. 3 <br />Complete one Section F for each project) <br />21. TITLE AND LOCATION (City and State) I 22. YEAR COMPL ETED <br />Palm & Hibiscus Island Stormwater & Roadway Improvements <br />Miami Beach, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2015 2019 <br />23.PROJECT OWNER'S INFORMATION <br />g. PROJECT OWNER <br />City of Miami Beach <br />h. POINT OF CONTACT <br />Jeffrey Crews, P.E. (Stantec) <br />Proiect Manaaer <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />i. POINT OF CONTACT TELEPHONE NUMBER <br />(954)804-2715 <br />Survey, engineering stormwater design, drainage calculations and modeling, cost estimates, permitting, and <br />engineering services during construction for the Palm and Hibiscus Island Stormwater and Roadway <br />Improvements. The project is a Capital Improvement Project structured as a design/build with Lanzo Construction. <br />GAS was responsible for the drainage system, roadway design and harmonization components of the GIP. The <br />design incorporated engineering techniques to reduce future sea level rises such as elevating the existing <br />roadways, increasing the size of the drainage system, providing water quality, installing three (3) stormwater <br />pump stations and backflow prevention devices to avoid extreme high tides from re-entering the systems. Work <br />also in cluded electric and communication line conversion from overhead to underground on Hibiscus Island. <br />Project Cost: $8,000,000 <br />25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />a. Craig A. Smith & Associates,Boca Raton, Florida Subconsultant <br />Inc. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />b. <br />{1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />C.
The URL can be used to link to this page
Your browser does not support the video tag.