Laserfiche WebLink
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S ' <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 70 projects, if not specified. <br />Complete one Section F for each project.) <br />0. EXAMPLE PROJECT KEY <br />NUMBER <br />2 <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMP LETED <br />Capital Improvements Project Phase Ill & IV <br />Stormwater Collection System with Master Pump Stations <br />Golden Beach, Florida <br />PROFESSIONAL SERVICES <br />2009 <br />CONSTRUCTION (If applicable) <br />2011 <br />23.PROJECT OWNER'S INFORMATION <br />d. PROJECT OWNER <br />Town of Golden Beach <br />e. POINT OF CONTACT <br />Alexander Diaz <br />Town Manaqer <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />f. POINT OF CONTACT TELEPHONE NUMBER <br />(305)932-0744 <br />Stormwater design, survey, utility locates, permitting, cost estimates, construction management and construction <br />observation, survey as-builts and certifications through project close-out as part of a Town Capital Improvement <br />Project Stormwater Improvements for Phase Ill and IV were designed and constructed to be consistent with the <br />Town's overall Master Plan. The project consisted of a stormwater master pumping station with submersible <br />pumps, 14,500 linear feet of DIP drainage pipe and force main (ranging in size from 16" to 72"), 205 drainage <br />structures and 7 outfalls. <br />Project Cost: $7,667,276 <br />25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />a.Craig A. Smith & Associates,Boca Raton, Florida Prime Consultant <br />Inc. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />b. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />C.