My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith & Associates
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craig A. Smith & Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:39:59 AM
Creation date
8/21/2020 11:38:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S ' 0. EXAMPLE PROJECT KEY NUMBER <br />1 QUALI FICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 70 projects, if not specified. <br />Complete one Section F for each project.) <br />21. TIT LE AND LOCATION (Coty and State) 22. YEAR COMPLETED <br />NE 174th Street Stormwater and Pavement Improvements <br />Sunny Isles Beach, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2014 2017 <br />23. PROJECT OWNER'S INFORMATION <br />a.PROJECT OWNER b. POINT OF CONTACT <br />City of Sunny Isles Beach Christopher Russo <br />City Manager <br />c. POI NT OF CONTACT TELEPHONE NUMBER <br />(305)792-1776 <br />24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost} <br />Survey, utility locates, preparation of engineering design and construction plans, stormwater modeling and calculations, <br />cost estimates, contract documents and permitting for the Roadway Improvements Project for NE 174th Street. The <br />project consists of a reconstruction of both the drainage and the road for approximately 0.2 miles from Collins Avenue <br />to North Bay Road. The existing roadway system was failing due to poor soil conditions, a limited drainage system and <br />an undersized outfall. The new roadway incorporated a reconstructed base with geotech fabric to offset the soils. The <br />design also included a new drainage system that meets water quality requirements, site demolition, road regrading, fibre <br />optic relocation, future conduit for telecom lines, sidewalks and paver walkways, landscaping, curbing, bike paths and <br />parallel parking. The design was completed within two years, under budget, at a cost of $212,180. Construction of the <br />first half of the project has been competed in 2016 with an estimated cost of $2,147,800. <br />25 FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />(1)FIRM NAME (2) FIRM LOCATION (City and State} (3) ROLE <br />a. Craig A. Smith & Associates, Boca Raton, Florida Prime Consultant <br />Inc. <br />(1) FIRM NAME (2)FIRM LOCATION (City and State} (3) ROLE <br />b. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State} (3) ROLE <br />c.
The URL can be used to link to this page
Your browser does not support the video tag.