My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith & Associates
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Craig A. Smith & Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:39:59 AM
Creation date
8/21/2020 11:38:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED <br />City-County Public Works Avenue L, M, N & 4th Street PROFESSIONAL CONSTRUCTION (if Sanitary Sewer Improvements SERVICES aoolicable) Glades County, Florida 2014 2016 <br />(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm <br />Responsible for daily construction observation / inspection for the installation of a duplex submersible lift station <br />with approximately 8-foot diameter wet well and 350 linear feet of 6-inch force main along with 6,344 linear feet of <br />8" and 1 O" gravity sewer with seventeen (17) sanitary sewer manholes. The total design costs for the project were <br />$52,425 with construction costs totaling $1,286,627. <br />d.(1) TITLE AND LOCATION (City and State)(2} YEAR COMPLETED <br />Bal Harbour Village PROFESSIONAL CONSTRUCTION (if Sanitary Sewer Improvements Phase1 SERVICES applicable) <br />Bal Harbour, Florida 2015 2017 <br />(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm <br />Responsible for the daily construction observation I inspection for the installation of a new triplex submersible pump <br />station with a 12 diameter wet well, control panel, automatic transfer switch receptacle, emergency generator, and <br />all associated appurtenances, in addition to approximately 1,350 linear feet of 18" gravity sewer lines to the pump <br />station. The project design cost was $182,804. Construction cost was $2,970,000. <br />e. (1)TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Avenue R Stormwater Improvements PROFESSIONAL CONSTRUCTION (if Moore Haven, Florida SERVICES applicable) <br />2016 2018 <br />(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm <br />Responsible for daily construction observation I inspection for the relocation of existing utilities and the installation <br />of 1,200 LF of plastic swale liner, 350 LF of PBC culverts, ten (1) concrete headwalls, one (1) drainage structure, <br />4,000 SY of sod and the regrading of 4,000 SY of swale. Construction cost was $393,304. <br />f. (1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED <br />Sanitary Sewer Pump Stations and Forcemain Improvements PROFESSIONAL CONSTRUCTION (if <br />Pembroke Park, Florida SERVICES applicable) <br />2002 2009 <br />(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm <br />Responsible for daily construction observation/ inspection for the installation of 1,500 linear feet of 10-inch force <br />main which remained a dry line for four years until further funding became available. Remaining work included the <br />rehabilitation of 22 lift stations, the decommissioning of 6 existing lift stations and the installation of a magmeter <br />with telemetry system. Design fees for this project were $417,700. The project was completed in 2009 after six <br />vears with a construction cost of $2,907,930.
The URL can be used to link to this page
Your browser does not support the video tag.