Laserfiche WebLink
C.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED <br />City-County Public Works Avenue L, M, N & 4th Street PROFESSIONAL CONSTRUCTION (if Sanitary Sewer Improvements SERVICES aoolicable) Glades County, Florida 2014 2016 <br />(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm <br />Responsible for daily construction observation / inspection for the installation of a duplex submersible lift station <br />with approximately 8-foot diameter wet well and 350 linear feet of 6-inch force main along with 6,344 linear feet of <br />8" and 1 O" gravity sewer with seventeen (17) sanitary sewer manholes. The total design costs for the project were <br />$52,425 with construction costs totaling $1,286,627. <br />d.(1) TITLE AND LOCATION (City and State)(2} YEAR COMPLETED <br />Bal Harbour Village PROFESSIONAL CONSTRUCTION (if Sanitary Sewer Improvements Phase1 SERVICES applicable) <br />Bal Harbour, Florida 2015 2017 <br />(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm <br />Responsible for the daily construction observation I inspection for the installation of a new triplex submersible pump <br />station with a 12 diameter wet well, control panel, automatic transfer switch receptacle, emergency generator, and <br />all associated appurtenances, in addition to approximately 1,350 linear feet of 18" gravity sewer lines to the pump <br />station. The project design cost was $182,804. Construction cost was $2,970,000. <br />e. (1)TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Avenue R Stormwater Improvements PROFESSIONAL CONSTRUCTION (if Moore Haven, Florida SERVICES applicable) <br />2016 2018 <br />(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm <br />Responsible for daily construction observation I inspection for the relocation of existing utilities and the installation <br />of 1,200 LF of plastic swale liner, 350 LF of PBC culverts, ten (1) concrete headwalls, one (1) drainage structure, <br />4,000 SY of sod and the regrading of 4,000 SY of swale. Construction cost was $393,304. <br />f. (1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED <br />Sanitary Sewer Pump Stations and Forcemain Improvements PROFESSIONAL CONSTRUCTION (if <br />Pembroke Park, Florida SERVICES applicable) <br />2002 2009 <br />(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm <br />Responsible for daily construction observation/ inspection for the installation of 1,500 linear feet of 10-inch force <br />main which remained a dry line for four years until further funding became available. Remaining work included the <br />rehabilitation of 22 lift stations, the decommissioning of 6 existing lift stations and the installation of a magmeter <br />with telemetry system. Design fees for this project were $417,700. The project was completed in 2009 after six <br />vears with a construction cost of $2,907,930.