Laserfiche WebLink
59 <br />TIMOTHY GRAY, PSM <br />Page 2 <br />Engineering Inspired Design. <br />the project surveyor. This districtwide had over 95 task work orders within a 5 year period. The tasks ranged from <br />simple parcel stake-outs to full design surveys. Some of the larger tasks included the full design surveys for S.R. 7, <br />S.R. 814 (Atlantic Blvd), S.R. 869 (SW 10th Street), and S.R. 820 (Hollywood/Pines Blvd), which includes three separate <br />surveys. Assignments included both horizontal and vertical control needed for the various tasks, as well. The planning <br />and adjusting of the GPS, the processing of EFB data and/or the adjusting of the level runs. Besides supervision, he <br />processed the survey data, calculated the historic baseline of survey and existing right of way and created and modified <br />Geopak TIN files. <br />FDOT District 4 Districtwide Miscellaneous Survey Services, FPID 229922-1-32-08, Broward County, FL: Mr. Gray was <br />the survey technician for this five year contract. This districtwide contract had over 77 task work orders. The range of <br />tasks included from simple parcel stake-outs to full design surveys. Some of the larger tasks included design surveys for <br />Glades Road, Griffin Road, S.R. A1A, 17th St. Causeway and two slip ramps on I-595/I-75. In addition, one of the bigger <br />tasks was to calculate the historic baseline of survey for I-75 from the information surveyed by the District’s in-house <br />crews. The contract also included finishing two right of way maps started by the District. Assignments included the <br />planning and adjusting of the GPS, the processing of EFB data and the adjustment of the level runs. Also, tasks included <br />basic calculations of parcels to be staked to full DTM’s as well as, processing the EFB data, calculate historic baselines <br />and existing right of way. <br />FDOT District 4, Districtwide R/W Mapping: Mr Gray was the Project Surveyor for a Miscellaneous Right-of-Way <br />Mapping Contract, providing Right-of-Way Maps, Control Surveys, and surveying services for projects including: SR- <br />870/Commercial Boulevard (Broward County), SR-882/Forest Hill Boulevard (Palm Beach County), SR-818/Griffin Road <br />(Broward County). Mr. Gray worked closely with the FDOT staff to provide mapping services for three complex projects <br />along SR-A1A (Broward and Palm Beach) which required more comprehensive research than is customary. <br />• Forest Hill Boulevard (S.R. 882), Wellington, FPID N/A (93016-2500): Mr. Gray was the Project Surveyor on <br />this Controls Survey and Genesis R/W Mapping Project which goes from S.R 7 to Military Trail for 5.8 miles. <br />He was the signing surveyor of the R/W Control Survey. He planned and adjusted the GPS sessions and <br />oversaw the technicians in processing the secondary traverses, processed all EFB data for the R/W Survey and <br />performed calculations for the R/W Map and supervised the technicians who completed the final drafting. <br />• Griffin Road Control Survey and Genesis Map (S.R 818), Dania Beach, FPID 413832-1: Mr. Gray was the <br />Project Surveyor on this Controls Survey and Genesis R/W Mapping Project which goes from S.R 7 to Federal <br />Highway (S.R. 5) for 4.2 miles. He was the signing surveyor of the R/W Control Survey. He planned the GPS <br />sessions and oversaw the technicians in processing of the primary and secondary survey data and performed <br />calculations for the R/W Map, reviewed title searches for the length of the corridor and supervised the <br />technicians who completed the final drafting. Section #86015-2525 <br />• S.R. A-1-A Control Survey and Genesis Maps, Boca Raton and Deerfield Beach, FPID N/A (86015-2525 & <br />93060-2507): Mr. Gray was the Project Surveyor on this Controls Survey and Genesis R/W Mapping Project <br />which goes from Hillsboro Blvd in Broward County to Spanish River Boulevard in Palm Beach County for 5.2 <br />miles. Two maps were prepared for this project. He was the signing surveyor of the R/W Control Surveys. He <br />planned the GPS sessions and oversaw the technicians in processing of the primary and secondary survey <br />data and performed calculations for the R/W Map, reviewed title searches for the length of the corridor and <br />supervised the technicians who completed the final drafting. Sections #86050-1510, 86050-2510, 93060- <br />1507, and 93060-2507 <br />• S.R. A-1-A Genesis Maps, Palm Beach, FPID 229858-1-32-01: Mr. Gray was the Project Surveyor on this <br />Controls Survey and Genesis R/W Mapping Project which goes from Lake Avenue (S.R. 802) to Southern <br />Boulevard (S.R. 80) in Palm Beach County for 4.31 miles. This project was taking the information from a <br />previous design and right of way survey from a sub-consultant and creating a genesis right of way map. <br />He was the signing surveyor of the R/W Control Survey. He performed calculations for the R/W Map and <br />supervised the technicians who were doing calculations and drafting as well as reviewed title searches for the <br />length of the corridor. Sections #93060-2525 and 93060-1525 <br />TAB F - FIRM REFERENCES & SIMILAR WORK COMPLETED: SURVEYORS & MAPPING