Laserfiche WebLink
Page 29 <br />Section E <br />Master Consulting Engineers, Inc. <br />Extreme Engineering | Incredible Results <br />21. TITLE AND LOCATION (CITY AND STATE)22. YEARS COMPLETED <br />Island Drive Bridge Rehabilitation Assessment | Delray Beach, Florida PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION <br />2019 <br />23. PROJECT OWNERS INFORMATION <br />A. PROJECT OWNER <br />City of Delray Beach <br />B. POINT OF CONTACT NAME <br /> Kevin Matthews <br />C. POINT OF CONTACT TELEPHONE NUMBER <br />(954) 599-2981 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (INCLUDE SCOPE, SIZE, AND COST) <br />An existing two lane, 12-foot concrete bridge approximately 70 feet long by 32 feet wide spanning over a waterway in <br />a residential neighborhood. The bridge was degrading and in need of repairs. The scope of services was divided into <br />three (3) phases. Phase I - Condition Assessment, Phase II - Design and Construction Documents, Phase III - Permitting, Bid <br />Documents & Pre-Construction Meetings. Phase I included a detailed inspection of the bridge and document in a report <br />along with an order of magnitude estimate for the required repairs. Phase II and Phase III are anticipated future projects. <br />Role: Structural Engineering | Type: Inspections/New Construction | Size: 2,240 SF | Structural Fee: $19,945.89 <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />A. <br />1) FIRM NAME <br />Master Consulting Engineers, Inc. <br />2) FIRM LOCATION (CITY AND STATE) <br />Ft. Lauderdale, Florida <br />3) ROLE <br />Structural Engineering <br />Consultants <br />B.1) FIRM NAME 2) FIRM LOCATION (CITY AND STATE)3) ROLE <br />C.1) FIRM NAME 2) FIRM LOCATION (CITY AND STATE)3) ROLE <br />D.1) FIRM NAME 2) FIRM LOCATION (CITY AND STATE)3) ROLE <br />E.1) FIRM NAME 2) FIRM LOCATION (CITY AND STATE)3) ROLE <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br /> 20. EXAMPLE PROJECT KEY <br />NUMBER <br />7