Laserfiche WebLink
Page 30 <br />Section E <br />Master Consulting Engineers, Inc. <br />Extreme Engineering | Incredible Results <br />21. TITLE AND LOCATION (CITY AND STATE)22. YEARS COMPLETED <br />City of Tampa David L. Tippin Water Treatment Facility | Tampa, FL PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION <br />2017 <br />23. PROJECT OWNERS INFORMATION <br />A. PROJECT OWNER <br />Carollo Engineers <br />B. POINT OF CONTACT NAME <br />Larry Elliot <br />C. POINT OF CONTACT TELEPHONE NUMBER <br />(813) 888-9572 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (INCLUDE SCOPE, SIZE, AND COST) <br />Provided structural engineering services for the David L. Tippin Water Treatment Facility Master Plan. MCE’s structural <br />services included the following tasks such as determining the status, condition, and functionality of the existing facilities <br />and structures. <br />Role: Structural Engineering | Type: Study and Renovation | Size: 150,000 SF | Construction Cost: +/-$5,472,880 <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />A. <br />1) FIRM NAME <br />Master Consulting Engineers, Inc. <br />2) FIRM LOCATION (CITY AND STATE) <br />Tampa, Florida <br />3) ROLE <br />Structural Engineering <br />Consultants <br />B.1) FIRM NAME 2) FIRM LOCATION (CITY AND STATE)3) ROLE <br />C.1) FIRM NAME 2) FIRM LOCATION (CITY AND STATE)3) ROLE <br />D.1) FIRM NAME 2) FIRM LOCATION (CITY AND STATE)3) ROLE <br />E.1) FIRM NAME 2) FIRM LOCATION (CITY AND STATE)3) ROLE <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br /> 20. EXAMPLE PROJECT KEY <br />NUMBER <br />8