My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Master Consulting Engineers, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Master Consulting Engineers, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:55:35 AM
Creation date
8/21/2020 11:55:04 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 40 <br />Section F <br />Master Consulting Engineers, Inc. <br />Extreme Engineering | Incredible Results <br />Local/Similar Continuing Contracts within 5 Years <br />Projects Highlights with References <br />A. Client: City of Delray Beach <br />Address: 100 N.W. 1st Avenue, Delray Beach, FL 33444 <br />Contact: Patrick Figurella | Civil Engineer <br />Phone: (561) 243-7000 | Fax: (561) 243-7777 <br />Email: Figurellap@mydelraybeach.com <br />B. Project Title: Banyan Seawall Repairs <br />C. Description: The seawall was previously inspected by <br />MCE at the request of the City because the walls had signs <br />of distress. The City requested MCE to review engineered <br />design of the repairs, interface with the owner and <br />their engineer/contractor and perform inspections to <br />completion of the repairs. <br />D. Year Completed: 2019 <br />A. Client: City of Delray Beach <br />Address: 100 N.W. 1st Avenue, Delray Beach, FL 33444 <br />Contact: Joe Williams | Project Manager <br />Phone: (561) 243-7000 | Fax: (561) 243-7777 <br />Email: williamsj@mydelraybeach.com <br />B. Project Title: Atlantic Dunes Park Seawall <br />C. Description: Phase 1 of the Atlantic Dunes Park includes <br />the design/construction of the two seawalls, parking <br />lots, and park improvements. MCE determined a design <br />solution for Atlantic Dunes Park Phase 1. The Seawall <br />will be constructed under Phase 1, MCE produced two <br />separate plan sets: one for the seawall and one for the <br />parking lot. The parking lot plans will be constructed at a <br />later time under Phase 2. <br />D. Year Completed: 2019 <br />A. Client: City of Delray Beach <br />Address: 100 N.W. 1st Avenue, Delray Beach, FL 33444 <br />Contact: Kevin Matthews | Project Manager <br />Phone: (561) 243-7000 | Fax: (561) 243-7777 <br />Email: matthwek@mydelraybeach.com <br />B. Project Title: Island Drive Bridge Rehabilitation <br />C. Description: An existing two 12-foot lanes concrete <br />bridge approximately 70 feet long by 32 feet wide <br />spanning over a waterway in a residential neighborhood <br />was degrading and in need of repairs. The scope of <br />services was divided into three (3) phases. MCE Phase <br />I included a detailed inspection of the bridge and <br />document in a report along with an order of magnitude <br />estimate for the required repairs. <br />D. Year Completed: Ongoing <br />Team Members Part of Referenced Service: <br />Armando Castellon, PE and Miguel Villegas, PE <br />Team Members Part of Referenced Service: <br />Armando Castellon, PE and Miguel Villegas, PE <br />Team Members Part of Referenced Service: <br />Armando Castellon, PE and Miguel Villegas, PE
The URL can be used to link to this page
Your browser does not support the video tag.