Laserfiche WebLink
Page 41 <br />Section F <br />Master Consulting Engineers, Inc. <br />Extreme Engineering | Incredible Results <br />A. Client: City of Pembroke Pines <br />Address: 8300 South Palm Drive <br />Pembroke Pines, FL 33025 <br />Contact: Giraldo Hernandez | Project Manager <br />Phone: (954) 518-9177 | Fax: Unknown <br />Email: ghernandez@ppines.com <br />B. Project Title: City of Pembroke Pines Wastewater <br />C. Description: An existing one-story reinforced concrete <br />building (approximately 26’x50’) with pre-cast flat roof <br />has a window on the NW wall that is to be converted to <br />accommodate a 6’ wide roll-up floor. Evaluate the wall <br />and provide details for the door opening. <br />D. Year Completed: 2019 <br />A. Client: PGAL <br />Address: 791 Park of Commerce, Suite 400 <br />Boca Raton, FL 33487 <br />Contact: Bruno Phillips | Senior Associate/PM <br />Phone: (561) 988-4002 | Fax: Unknown <br />Email: bphillips@pgal.com <br />B. Project Title: Boca Delray Guard House <br />C. Description: The existing one-story guard house is <br />being replaced with a new guard house and portico. <br />The building and portico have a footprint area of <br />approximately 513 square feet. The building structure <br />has reinforced concrete slab on grade, reinforced <br />concrete masonry walls with pre manufactured wood <br />roof trusses and timber wood framed roof at the portico. <br />D. Year Completed: 2019 <br />A. Client: The Martin Architectural Group <br />Address: 6810 Lyons Technology Circleson Street <br />Suite 185, Coconut Creek, FL 33073 <br />Contact: Annabella Garcia | Principal <br />Phone: (954) 428-1618 | Fax: (813) 221-9174 <br />Email: agarcia@MARTINAIA.com <br />B. Project Title: Golden Beach Civic Center <br />C. Description: The Civic Center will consist of a new <br />multi-story administration building that will contain <br />the Town Administrative offices. Will also include <br />the complete rehabilitation of the Town’s existing <br />administrative, and police facilities to be used for <br />recreational purposes for the Town’s residents. The <br />structure will most likely consist of precast PSI system or <br />a flat slab deck with CIP concrete beams and columns. <br />The Civic center will have concrete bunker at the 3rd <br />level. <br />D. Year Completed: Ongoing <br />Team Members Part of Referenced Service: <br />Armando Castellon, PE and Carolyn Vega-Gonzalez, EIT <br />Team Members Part of Referenced Service: <br />Armando Castellon, PE and Carolyn Vega-Gonzalez, EIT <br />Team Members Part of Referenced Service: <br />Armando Castellon, PE and Carolyn Vega-Gonzalez, EIT