Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Jeovanny Rodriguez, PE <br />13. ROLE IN THIS CONTRACT <br />Sr. Project Manager- QA/QC <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />27 <br />b. WITH CURRENT FIRM <br />>1 <br />15. FIRM NAME AND LOCATION (City and State) <br />SRS Engineering, Inc., Miami, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />BS Civil Engineering, Florida International <br />University <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />2004 / Civil Engineer / Florida PE61825 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Mary Brickell Drainage Improvements– City of Miami <br />Miami, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017-2018 <br />CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Director at City of Miami, handling improvements of several roads. Design and planning for improvements for SW 9th <br />Street, SW 10th Street, SW 11th Street, SW 12th Street between NW 1st Court and Miami Avenue. The total <br />reconstruction of the existing two-lane roads involved the drainage system containing French Drains, Solid <br />interconnected pipes and new storm water pump station at SW 8th Street and SW 1st Court, each pump station <br />requiring three deep injection wells and overflow connection to Miami River. Other aspects of the design included <br />pavement, subsurface elements, pavement markings, and new street lighting. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />San Marco Drainage Improvements – City of Miami <br />Miami, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015-2016 <br />CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) ANDSPECIFIC ROLE Check if project performed with current firm <br />Director at City of Miami, liable for the design and planning of improvements to several roads in the Island of San <br />Marco. Reconstruction of existing two-lane roads. Highlights encompassed pavement, subsurface elements, pavement <br />markings, street lighting and the new drainage system composed of French drains, solid interconnected pipes, and a <br />new storm water pump station at the east side of island. Pump station incorporates three deep injection wells and <br />overflow connection to Biscayne Bay. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />NW North River Drive (Spring Gardens) from NW 7th Avenue to NW <br />12th Avenue – City of Miami <br />Miami, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2013-2014 <br />CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Director at City of Miami, organizing a total reconstruction of an existing a two - lane roadway design and planning. <br />Design involved drainage system containing French drains, solid interconnected pipes and two out falls into the Miami <br />River, pavement, subsurface elements, pavement markings, relocation of FPL power distributions and poles. Other <br />designs were needed for new street lighting and the construction of Miami River walk adjacent to the roadway. <br />(1) TITLE AND LOCATION (City and State) <br />NW South River Drive (Segment D) from NW 5th Street to SW <br />3rd – City of Miami <br />Miami, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2012-2013 <br />CONSTRUCTION (If applicable) <br />22