My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRS Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
SRS Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:58:16 AM
Creation date
8/21/2020 11:57:09 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />d. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br /> <br />Director supervising a total reconstruction of an existing a two- lane roadway design and planning. Roadway features involved <br />pavement, subsurface elements, pavement markings, street lighting, and relocation of FPL power distributions and poles. <br />Along with a drainage system of French drains and solid interconnected pipes, plus two out falls to the Miami River and <br />construction of the Miami River walk adjacent to the roadway. <br /> <br /> <br /> <br /> <br /> <br /> <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />NW 137th Avenue from NW 14th Street to NW 17th Street <br />Miami, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2009-2011 <br />CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Director overseeing a new four-lane divided roadway design and planning. Roadway elements comprise of pavement, subsurface <br />elements, pavement markings, traffic signal at 137th Ave and NW 12th Street, street lighting, and wetlands mitigation area <br />adjacent to the roadway. Additional tasks involved drainage system that r equired French drains and solid interconnected pipes, a <br />canal culvert of 120” DIA, relocation of FPL power lines for both distributions and transmission poles. On top of a new railr oad <br />crossing at NW 137th Avenue and NW 12th Street. <br /> <br />23
The URL can be used to link to this page
Your browser does not support the video tag.