Laserfiche WebLink
<br />d. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br /> <br />Director supervising a total reconstruction of an existing a two- lane roadway design and planning. Roadway features involved <br />pavement, subsurface elements, pavement markings, street lighting, and relocation of FPL power distributions and poles. <br />Along with a drainage system of French drains and solid interconnected pipes, plus two out falls to the Miami River and <br />construction of the Miami River walk adjacent to the roadway. <br /> <br /> <br /> <br /> <br /> <br /> <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />NW 137th Avenue from NW 14th Street to NW 17th Street <br />Miami, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2009-2011 <br />CONSTRUCTION (If applicable) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Director overseeing a new four-lane divided roadway design and planning. Roadway elements comprise of pavement, subsurface <br />elements, pavement markings, traffic signal at 137th Ave and NW 12th Street, street lighting, and wetlands mitigation area <br />adjacent to the roadway. Additional tasks involved drainage system that r equired French drains and solid interconnected pipes, a <br />canal culvert of 120” DIA, relocation of FPL power lines for both distributions and transmission poles. On top of a new railr oad <br />crossing at NW 137th Avenue and NW 12th Street. <br /> <br />23