Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Jean-Claude Fontaneau, EI <br />13. ROLE IN THIS CONTRACT <br />Sr. Project Manager <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />23 <br />b. WITH CURRENT FIRM <br />21 <br />15. FIRM NAME AND LOCATION (City and State) <br />SRS Engineering, Inc., Miami, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />BS Civil Engineering <br />Florida International University, Miami, FL - 1996 <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />1999 / Engineering Intern / Florida No. 1100004978 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br />19. RELEVANT PROJECTS <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Naranja Lakes CRA <br />Naranja, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2007 <br />CONSTRUCTION (If applicable) <br />2011 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br /> <br />As Construction Consultant, SRS’s responsibilities involved the review and recommendation of contract reward to the <br />Developer, the review and approval of payment requests submitted by Developer, review and make recommendations <br />pertaining to change orders, design changes and budget reallocations, meeting with the Developer on a regular basis regarding <br />the construction schedule and related issues, conducting regular site visits of the construction site to observe o n-going <br />construction, and attend all meetings, as directed by the CRA, to provide consultation to the CRA. <br />Construction improvements encompassed roadways, landscaping, new bridge, water and sewer pipelines, as well as sewer pump <br />stations. <br />$208,000 Construction Costs: $17,745,355 Role: Project Engineer <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Miami-Dade County Pump Station Upgrades <br />Miami-Dade County, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2008 <br />PROFESSIONAL SERVICES <br />2012 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br /> <br />SRS provided engineering design and preparation of construction documents (Plans and Specifications) for the construction of <br />upgrades to existing Pump Stations. Upgrades included new pumping units, new electrical control panels, new electrical <br />services, new telemetry systems, replacement of PS piping, new valve vaults and fittings, new wet wells, demolition of existing <br />pump stations, and associated site improvements. Additional services consisted of plans processing, permitting, and bid phase <br />services. SRS also provided limited construction support services such as attending construction meetings, respond <br />to RFI’s, review shop drawings, review, and approval to change order requests, attend PS Start Up Inspection. <br />Upgrades were provided to Pump Station Nos. 7, 64, 140, 427, 430, 502, 767 and 1018. $530,087 Role: Project <br />Engineer <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />NW 138th Street <br />Hialeah, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2008 <br />PROFESSIONAL SERVICES <br />n/a <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br /> <br />SRS was responsible for the engineering design, preparation of construction documents, plans permitting (Miami-Dade County <br />Public Works, DERM, SFWMD, and FDOT), pre-construction phase support services to the City of Hialeah for the construction <br />of NW 138th Street between I-75 and NW 107th Avenue. The work comprised of the preparation of designs for the construction <br />of drainage improvements, street lighting and signalization, along with the design of a new 50’ wide canal including culverts <br />and a canal wall along the north side of NW 138th Street between NW 97th Avenue and I-75. The new design incorporates a 6- <br />lane divided roadway, double left turns, deceleration lanes, and signalized intersections at NW 97 th Avenue, NW 102nd Avenue, <br />and NW 107th Avenue. <br /> <br />Construction administration support and inspection services during the construction including review shop drawings, respond <br />to RFIs, review payment request, conduct periodic inspections, and engineer certifications. $417,374 Construction Costs: <br />$12,450,000 Role: Project Engineer <br />24