E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Jean-Claude Fontaneau, EI
<br />13. ROLE IN THIS CONTRACT
<br />Sr. Project Manager
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />23
<br />b. WITH CURRENT FIRM
<br />21
<br />15. FIRM NAME AND LOCATION (City and State)
<br />SRS Engineering, Inc., Miami, FL
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />BS Civil Engineering
<br />Florida International University, Miami, FL - 1996
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />1999 / Engineering Intern / Florida No. 1100004978
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />
<br />19. RELEVANT PROJECTS
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Naranja Lakes CRA
<br />Naranja, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2007
<br />CONSTRUCTION (If applicable)
<br />2011
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />
<br />As Construction Consultant, SRS’s responsibilities involved the review and recommendation of contract reward to the
<br />Developer, the review and approval of payment requests submitted by Developer, review and make recommendations
<br />pertaining to change orders, design changes and budget reallocations, meeting with the Developer on a regular basis regarding
<br />the construction schedule and related issues, conducting regular site visits of the construction site to observe o n-going
<br />construction, and attend all meetings, as directed by the CRA, to provide consultation to the CRA.
<br />Construction improvements encompassed roadways, landscaping, new bridge, water and sewer pipelines, as well as sewer pump
<br />stations.
<br />$208,000 Construction Costs: $17,745,355 Role: Project Engineer
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Miami-Dade County Pump Station Upgrades
<br />Miami-Dade County, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2008
<br />PROFESSIONAL SERVICES
<br />2012
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />
<br />SRS provided engineering design and preparation of construction documents (Plans and Specifications) for the construction of
<br />upgrades to existing Pump Stations. Upgrades included new pumping units, new electrical control panels, new electrical
<br />services, new telemetry systems, replacement of PS piping, new valve vaults and fittings, new wet wells, demolition of existing
<br />pump stations, and associated site improvements. Additional services consisted of plans processing, permitting, and bid phase
<br />services. SRS also provided limited construction support services such as attending construction meetings, respond
<br />to RFI’s, review shop drawings, review, and approval to change order requests, attend PS Start Up Inspection.
<br />Upgrades were provided to Pump Station Nos. 7, 64, 140, 427, 430, 502, 767 and 1018. $530,087 Role: Project
<br />Engineer
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />NW 138th Street
<br />Hialeah, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2008
<br />PROFESSIONAL SERVICES
<br />n/a
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />
<br />SRS was responsible for the engineering design, preparation of construction documents, plans permitting (Miami-Dade County
<br />Public Works, DERM, SFWMD, and FDOT), pre-construction phase support services to the City of Hialeah for the construction
<br />of NW 138th Street between I-75 and NW 107th Avenue. The work comprised of the preparation of designs for the construction
<br />of drainage improvements, street lighting and signalization, along with the design of a new 50’ wide canal including culverts
<br />and a canal wall along the north side of NW 138th Street between NW 97th Avenue and I-75. The new design incorporates a 6-
<br />lane divided roadway, double left turns, deceleration lanes, and signalized intersections at NW 97 th Avenue, NW 102nd Avenue,
<br />and NW 107th Avenue.
<br />
<br />Construction administration support and inspection services during the construction including review shop drawings, respond
<br />to RFIs, review payment request, conduct periodic inspections, and engineer certifications. $417,374 Construction Costs:
<br />$12,450,000 Role: Project Engineer
<br />24
|