Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br />12. NAME 13. ROLE IN THIS <br />CONTRACT 14. YEARS EXPERIENCE <br />Abraham Hadad Project Surveyor a. TOTAL <br />28 <br /> b. WITH CURRENT FIRM <br />19 <br />15. FIRM NAME AND LOCATION (City and State) <br />Hadonne Corp. 1985 NW 88th Ct., suite 101 Doral, FL 33172 <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Attended University of Oriente Santiago de Cuba, Cuba <br /> 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Professional Surveyor and Mapper: Florida LS6006 (2000) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> Business Financial Classes - CAiCE Training- Estimating Training - M.O.T. Training - OSHA Training - Project Management Classes <br /> <br />19. RELEVANT PROJECTS <br />a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Medley Flood Mitigation, Town of Medley, Medley, Florida. PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />2016 N/A <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Surveyor, Surveying and S.U.E. services for the project known as the “Flood Mitigation South” to establish horizontal and vertical <br />controls on the proposed route. Established benchmarks and control points along route. Services include the creation of a master horizontal control <br />file that will be used throughout the planning and design of the roadway alignment. The deliverable included the location of the existing right-of- <br />way lines for portion of the intersecting roadways that fall with the project limits. <br />Route Survey and Topography survey. Surface evidence of underground utilities, including wells and septic tanks, will be located. All commercial <br />buildings will be located along the proposed route. Invert elevations and pipe sizes will be obtained on all st ructures along the proposed route. The <br />Surveyor will provide Subsurface Utility Engineering (SUE) services within the corridor limits. Identify all utilities in the corridor; researched <br />Utility Permits applications, Sunshine State One Call, Design Location Survey, and existing utility as-built plans <br />b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Legion Park Improvements, Miami, FL: <br /> <br />PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />2016 N/A <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Land surveying and mapping services for the Legion Park Improvements located at 6447 NE 7th Avenue, Miami, FL 33138. Services p rovided <br />included Land Surveying and Mapping Services. Boundary and Topographic Surveys included: Located the project site in relation to the property <br />boundaries, Identified all interior improvements and improvements in the adjoining half rights-of-way, Located all trees within the property <br />boundaries; provided a tree table with tree name, trunk diameter, height, and canopy , Located all buildings within the survey area; provided building <br />corners, perimeter dimensions, setbacks distances, top of parapet elevations, and finished floor elevations, Elevation shots at 25-50-foot intervals at <br />open park areas and 5-10 foot intervals at critical areas, such as around buildings, and existing structures; additionally, collected all visible terrain <br />deviation such as low and high points, Located all courts with court lines, fences, playgrounds, etc., Collected invert elevation, pipe size, and pipe <br />type of all accessible existing inlets and manholes, Located all overhead utility lines and poles within the survey area, Showed existing easements. <br />c (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Alton Road from 48th Street to Allison Road Miami Beach, Florida PROFESSIONAL <br />SERVICES <br />CONSTRUCTION (If applicable) <br />2018 N/A <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />P.N.C. Horizontal Work: Recovered P.N. Points at 1000 foot intervals with intervisibility between points placed away from blo ck corners and out of <br />construction limits, Control Points Level Run: Digital Terrain Model (D.T.M.): Performed in areas of topography with the exceptions of topo, areas <br />for M.O.T. and areas on side streets as determined by the Design Project Manager as needed. Under this task we collected addi tional field data in <br />order to produce a D.T.M. of the additional 100 feet from the point of termination along 42 intersecting streets along the survey route of a previously <br />completed Survey by this firm. Drainage Survey: Obtain all drainage details information within the DTM AREA, collected Rim & Invert elevations, <br />pipe sizes, materials and direction of approximately 80 drainage structures. <br />d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> <br />B-17365 - Shorecrest Area Survey within the City of Miami <br />PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />2018 N/A <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE ☐ Check if project performed with current firm <br />30