My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRS Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
SRS Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:58:16 AM
Creation date
8/21/2020 11:57:09 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br />12. NAME 13. ROLE IN THIS <br />CONTRACT 14. YEARS EXPERIENCE <br />Raul Izquierdo Project Surveyor a. TOTAL <br />28 <br /> b. WITH CURRENT FIRM <br />8 <br />15. FIRM NAME AND LOCATION (City and State) <br />Hadonne Corp. 1985 NW 88th Ct., suite 101 Doral, FL 33172 <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Miami Dade Community College <br /> 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Professional Surveyor and Mapper: Florida LS6099 (2000) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />CAiCE Training- M.O.T. Training - OSHA Training - Project Management Classes <br /> <br />19. RELEVANT PROJECTS <br />a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> City of Miami Comprehensive Stormwater Master Plan <br /> <br /> PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />2019 N/A <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />City of Miami Project B-30632A Development of a new and Comprehensive SWMP to establish a policy framework to ensure that the integrity of <br />the City’s Future is protected and enhance over time. <br />Mr. Izquierdo was the project surveyor with direct supervision of the following scope of service: <br />Horizontal and Vertical Control Survey: Stablish Main Horizontal and Vertical Network within the City Limits, Th e Control Monuments were set or <br />recovered and documented in a Survey Control Map that will be utilized during the length of the project. <br />GPS locate 500 features: Located above ground features utilizing Survey GPS Equipment x,y @ 10 Locations per Day Locations per day . <br />Survey 500 features: Locate above ground features utilizing Survey GPS Equipment (x,y,x) @ 10 Locations per day. <br />Perform 500 building finished-floor elevations: Elevation shots were taken to stablish the Finished Floor Elevation. <br />Seawall Survey: Performed additional survey to determine the seawall elevation in locations that were not be covered by the aerial survey Aerial <br />photogrammetry survey of unobstructed seawalls and fill in survey of 1,500 points , this effort was be performed with various methods of survey. <br />Aerial Target Ground Control: Placed Aerial Targets for Photogrammetric Survey at 5 Targets per day for an estimated total of 100 Targets. <br />Canal Cross Sections: Performed 150 Canal Cross Sections at 2 cross sections per day. <br />b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Contract E15-PWWM-07 Project 20170037 Topographic survey of various <br />intersection of Miami Dade County <br /> <br />PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />2019 N/A <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />• Establish the centerlines of rights of way, based on existing Plats or fractional lines if the adjacent properties are no platted. <br />• Show right of way lines as per Public Records for the project area <br />• Establish a physical control baseline for the project using the center lines of the right of ways <br />• Establish a site benchmark in NGVD 1929 elevation datum <br />• Locate all topographic data for approximately 50 beyond the PC of the radius returns along all intersecting Streets. <br />• All drainage structures must be located including the size of the structures and drainage pipes inverts, elevations and size <br />• Locate all existing mast arm including lengths and size <br />• Cross section data every 25’ <br />• All data to be on state plane coordinates and overlaid on an aerial photograph <br />• Final survey will be a signed and sealed Topographic Survey in a Scale of 1”=20’ <br />• Locate all overhead wires and ground clearance at the maximum sag point. <br />• Digital Cad drawing in 2014 Auto Cad version <br />• Origin of Control points should be denoted in survey or on a separated survey report <br />• Origin of Vertical control should be denoted and copies of field work should be provided <br />c (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Buena Vista Neighborhood Traffic Calming” Project Number B-193620 PROFESSIONAL <br />SERVICES <br />CONSTRUCTION (If applicable) <br />2019 N/A <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />32
The URL can be used to link to this page
Your browser does not support the video tag.