Laserfiche WebLink
<br />Performed Topographic Survey, survey to including following items: <br />Depict Right of Way information based on the City of Miami Street ATLAS sheets, record plats and property appraisal database including all <br />current dedicated areas. <br />Survey limits to extend from Right of Way to Right of Way along the corridor 15 feet into the private properties. <br />Topo survey to extend 150 feet from the end of radius return into the intersecting streets. <br />Locate all above ground features, including site lot lines, trees (Height, caliper, species), House number, Gates and Driveways. <br />Collect Rim elevations, invert elevations, bottom of structure and pipe material. <br />Take elevation shots (Cross section elevations) at 25-foot intervals. <br />Elevations to be referenced to City of Miami Datum <br />Locate all existing ADA ramps and existing driveway approaches. <br />HC will deliver three signed and sealed copies of the resulting map of survey in addition <br />Limits of the Survey to extend 15 feet into the private properties along the corridor (when not accessible take elevation shots on the ground) <br />d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> <br />B-17365 - Shorecrest Area Survey within the City of Miami <br />PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />2018 N/A <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE ☐ Check if project performed with current firm <br />Perform Topographic Survey of approximately 45,000 linear feet of road, su rvey to include the following items: <br />Depict Right of Way information based on the City of Miami Street ATLAS sheets, record plats and property appraisal database including all <br />current dedicated areas.Survey limits to extend from Right of Way to Right of Way along the corridor 15 feet into the private properties. <br />Topo survey to extend 100 feet from the end of radius return into the intersecting streets. Locate all above ground features, including site lot lines, <br />trees (Height, caliper, species), House number. Collect Rim elevations, invert elevations, bottom of structure and pipe material.Take elevation shots <br />(Cross section elevations) at 25-foot intervals, Elevations to be referenced to NGVD29, Locate all existing ADA ramps and existing driveway <br />approaches, HC will deliver three signed and sealed copies of the resulting map of su rvey in addition, <br />Collect Finished Floor elevation of all Buildings within the corridor, Limits of the Survey to extend 15 feet into the private properties along the <br />corridor (when not accessible take elevation shots on the ground <br />e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> City of Sweetwater Storm Drainage Master Plan. <br /> <br />PROFESSIONAL <br />SERVICES CONSTRUCTION (If applicable) <br />2020 N/A <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Task-01) Collect aerial imaging of the project area with an UAV in order to produce a High Definition Point Cloud. <br />Task-02) Collect streets profile of all roads within the project area, we will take elevation shots at 20-feet intervals. <br />Task-03) Create a beard earth surface of the area in order to extract ground elevation shots that can be used for modeling, these shots will be <br />extracted at ground level only at 250 feet spacing <br /> <br />33