My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRS Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
SRS Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 11:58:16 AM
Creation date
8/21/2020 11:57:09 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY NUMBER <br />3 <br />21. TITLE AND LOCATION (City and State) <br />Roadway and Drainage Improvements NW South River Drive-NW 116th Way <br />and NW 121st Way <br />Medley, FL <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If applicable) <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER <br />Town of Medley <br />b. POINT OF CONTACT NAME <br />Jorge E. Corzo, PE, CFM <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />305-887-9541 Ext. 123 <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, <br />size, and cost) <br /> <br />The scope of work for this project was to provide engineering design, preparation of construction documents, plans <br />processing and permitting (Town of Medley, Miami-Dade County Public Works, and Miami-Dade County Regulatory <br />and Economic Resources (RER, formerly DERM)), as well as providing construction phase support services to the <br />Town of Medley for the construction of NW South River Drive between NW 121st Way and NW 116th Way. <br /> <br />NW South River Drive project limits are from approximately 100 linear feet north of NW 116th Way to approximately <br />112’ south of NW 121st Way, approximately 2,260 linear feet. The new roadway will be a minimum of 50’ wide <br />roadway with two travel lanes, center median, gutter curb, and drainage system. Sidewalks and ADA ramps <br />provided at intersections. Furthermore, SRS aided Town Attorney and Surveyor in acquisition of any additional right <br />of way required. <br /> <br />General project management services consisted of attending additional meetings with City, management of design <br />staff and project requirements, additional site visits, and conducting quality control reviews. Revisions to project <br />drawings due to new roadway cross sections involving revisions to typical roadway sections, plan and profiles, cross <br />sections, pavement marking and signage, quantities, and other miscellaneous sheets. Preparation of new drainage <br />calculations showing interconnected drainage systems with new outfall discharges to canal. Submittal to Town for <br />review and comments. Preparation of permit applications and support documents with project drawings for <br />submittal to RER and SFWMD for permit approval. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />a. <br />(1) FIRM NAME <br />SRS Engineering, Inc. <br />(2) FIRM LOCATION (City and State) <br />Miami, FL <br />(3) ROLE <br />Civil Engineering Services <br /> <br />b. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />39
The URL can be used to link to this page
Your browser does not support the video tag.