Laserfiche WebLink
G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS <br />29. EXAMPLE PROJECTS KEY <br />26. NAMES OF KEY <br />PERSONNEL <br />(From Section E, <br />Block 12) <br />27. ROLE IN THIS <br />CONTRACT <br />(From Section E, <br />Block 13) <br />28. EXAMPLE PROJECTS LISTED IN SECTION F <br />(Fill in "Example Projects Key" section below before completing <br />table. Place "X" under project key number for <br />participation in same or similar role.) <br />1 2 3 4 5 6 7 8 9 10 <br />Ignacio Serralta, PE Civil Engineer X X X X X X X X X X <br /> <br />Jeovanny Rodriguez, PE <br /> <br />Sr. Project Manager <br /> <br />Jean-Claude Fontaneau, EI Sr. Project Manager X X X X X X X X X X <br />Patricia Bosch, PE Project Manager X X X <br />Marilys Falcon Project Engineer X X X <br />Abraham Hadad Project Surveyor <br />Raul Izquierdo Project Surveyor <br />Ulysses Batista Project <br />Management/Supervision <br /> <br />Riza Hosein, P.G. Project Manager/ <br />Professional Geologist <br /> <br />VMB Venketesan, P.E. Civil Engineer <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS <br />29. EXAMPLE PROJECTS KEY <br /> <br />NO. <br /> <br />TITLE OF EXAMPLE PROJECT (FROM SECTION F) <br /> <br />NO. <br /> <br />TITLE OF EXAMPLE PROJECT (FROM SECTION F) <br /> <br />1 <br />Roadway Improvements to NW 58th Street <br />from NW 97th Avenue to SR-826 Miami, FL <br /> Aquabella Section III <br />Hialeah Gardens, FL <br /> Continuing Services Contract – City of South Miami, <br />South Miami, FL 7 City of Miami Continuing Services Contract –NE 2nd <br />Avenue Improvements from NE 42nd Street to NE <br />51st Street, Miami, FL <br /> <br />3 <br />Roadway and Drainage Improvements NW South <br />River Drive-NW 116th Way and NW 121st Way <br />Medley, FL <br /> <br />8 <br />NW 142nd Street Water and Sewer Improvements <br />Hialeah, FL <br /> <br />4 <br />Flagler Countyline Corporate Park <br />Hialeah Gardens, FL <br /> City of Coral Gables Ponce de Leon CEI (LAP Project) <br />Coral Gables, FL <br /> <br />5 <br />Continuing Services Contract – City of Miami – B- <br />50904, NW 7th Street Road Drainage Improvements <br />between NW 9th Court and NW North River Drive <br />Miami, FL <br /> <br />10 <br />NW 138th Street Roadway and Drainage <br />Improvements <br />Hialeah, FL <br />2 <br />47