Laserfiche WebLink
<br /> <br /> <br />Jean-Claude Fontaneau, EI <br /> <br />These projects include development of general plans and notes, design of plans and profiles, <br />preliminary maintenance of traffic and calculations of restraint pipes. <br />City of Hialeah-Section 26 Sewer Improvements, Regional Pump Station Project Manager that <br />completed the drawings for the new regional pump station, consisting of a submersible pump <br />station with 4 submersible pumping units (215 HP) with a peak capacity of 8,880 GPM (12.8 MGD) <br />and valve chamber. The pump station site included a building housing the electrical control room <br />and a storage area: an odor control unit, MDWASD flow meter, emergency generator, and other <br />improvements. The project also included the design of upgrading improvements to 11 existing <br />pump stations (Pump stations: 132, 133, 134, 135, 137, 138, 139, 140, 141, 142, and 144). <br />Improvements included renewal of existing pumping units, electrical control panels and services, <br />replacement of PS piping, hatches, telemetry systems, emergency generators with fuel tanks, <br />valve vaults and fittings, as well as demolition of existing wet well tops and wet well refurbishment. <br />Furthermore Mr. Jean-Claude Fontaneau’s function included the production of construction <br />drawings for approximately 15,600 LF of sewer force main pipelines (8-inch to 30-inch diameter), <br />8,226 LF of 48-inch, and 3,999 LF of 36-inch transmission sewer force main pipelines, that included <br />a 48-inch pipe canal crossing. <br />Homestead, Florida- Homestead Air Force Base, Pump Station No. 934 Project Manager <br />managing the development of construction documents for the upgrading of PS No. 934 up to <br />MDWASD standards. Designing of construction documents, demolition drawings, structural <br />details, new electrical controls, SCADA, and a new 12-inch force main. Duties also included <br />obtaining permits, construction management, inspections and close out. <br />City of Hialeah- Hialeah Transmission Force Mains, Annex Area Project Manager, who’s <br />function included the design and preparation of construction documents for the construction of a <br />new transmission force main. The new force main was constructed from NW 87th Avenue and W <br />80th Street to a connection point within the existing MDWASD force main, located at W 8th Avenue <br />and W 76th Street, that would serve the newly annexed area in the City of Hialeah. This work <br />included contracting and coordinating all work with specialty firms, such as Surveyors, <br />Geotechnical, and Structural Engineers. As well as the preparation/submittal of design <br />calculations, the applications/plans for “dry-run” and “final” review by the local regulatory agencies. <br />City of Hialeah- Water Mains for Reverse Osmosis Water Treatment Plant, Annex Area, <br />Senior Project Manager supervising the preparation of civil engineering design plans and <br />specifications for the construction of maintenance and water mains from HROWTP to serve the <br />Annexation Area along NW 102nd Avenue and NW 170th Street. The construction documents <br />included approximately 7,640 LF of 12-inch maintenance water mains and 7,640 LF of 12-inch, <br />16-inch, 20-inch and 24-inch raw water mains combined. <br />City of Miami- MDWASD Pump Stations Upgrades Senior Project Manager in charge of the <br />design and arrangement of construction documents, plans and specifications, needed for the <br />construction of the renovation to current pump stations. Renovations included all brand-new <br />pumping units, electrical control panels, electrical control services, telemetry systems, wet wells, <br />68