Laserfiche WebLink
<br />STANDARD FORM 330 (REV. 8/2016) <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME Justin Freedman 13. ROLE IN THIS CONTRACT Senior Scientist 14. YEARS EXPERIENCE <br />a. TOTAL 18 b. WITH CURRENT FIRM 12 <br />15. FIRM NAME AND LOCATION (City and State) E Sciences, Incorporated, Miami, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />M.S., Marine Biology <br />B.A., Biology <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />N/A <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Certified Arborist, FL 5488A; Tree Risk Assessment Qualification (ISA); FDEP Certified Erosion and Sediment Control Inspector and Instructor; <br />PADI Advanced Open Water, Enriched Air Certified Diver; Certified Green Industries Best Management Practices Instructor. Memberships: Florida <br />Chapter of the International Society of Arboriculture; International Society of Arboriculture; Florida Urban Forestry Council; Landscape Inspectors <br />Association of Florida; South Florida Association of Environmental Professionals; Southeast Florida Coral Reef Initiative <br /> <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) General Engineering Contract, City of Doral, <br />Miami-Dade County, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 – Ongoing <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />E Sciences has provided a variety of consulting services to the City of Doral through their General Engineering Contracts. Services <br />have included grant writing, a city-wide tree inventory conducted in three phases, a city-wide planting plan, educational programing <br />and materials related to tree care and an environmental sampling project conducted to investigate odor complaints. Mr. Freedman <br />serves as the project manager and primary client contact for these projects. Contract Budget/Fees: $171,969 <br /> <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Environmental Engineering Continuing Services, <br />City of Miami Beach, Miami-Dade County, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2011 – Ongoing <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Groundwater Elevations Monitoring and Mapping Project (Sea Level Rise Study): The purpose of the study was to evaluate <br />low lying areas vulnerable to sea level rise within the City based on the assumption that the groundwater levels under the City are <br />tidally influenced and therefore flooding may also be influenced or exacerbated by tidal fluctuations. To accomplish this, the <br />E Sciences team monitored groundwater elevations and other data over a period of seven months. The elevation data collected <br />was used in conjunction with Light Detection and Ranging (LiDAR) topography and tidal data to model vulnerability and provide a <br />basis for the City to determine stormwater priorities. Mr. Freedman assisted on the preparation of the report for the City and <br />presented the findings of this study at the 2013 Annual South Florida Association of Environmental Processionals Symposium. <br />Canopy Analysis: Mr. Freedman served as the senior scientist for this canopy analysis project for the City. Using <br />i-Tree Canopy, he and his team estimated the canopy coverage for the City’s urban forest, as well as percentage of available <br />space remaining within the City for additional tree planting. He developed a one-page brochure for public education documenting <br />the information from the study. Street Tree Inventory: Mr. Freedman was the senior scientist for two phases of street tree <br />inventories for the City. The two phases encompassed the Normandy Shores and Normandy Isles neighborhoods. Contract <br />Budget/Fees: $415,857 <br /> <br />c. <br />(1) TITLE AND LOCATION (City and State) Continuing Contract for General Environmental Services, City of Fort <br />Lauderdale, Broward County, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2007 – Ongoing <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Fort Lauderdale Executive Airport Burrowing Owl Survey: Mr. Freedman conducted burrowing owl surveys and prepared the <br />permit application. Benthic Surveys for Sylvan Lake Canal & Seminole River Canal: E Sciences conducted benthic resources <br />surveys to support dredging projects in two City-maintained waterways. E Sciences’ biologists snorkeled each site to observe the <br />presence of regulated benthic resources (i.e. seagrasses, corals, etc.). E Sciences’ staff provided the City reports to accompany <br />their permit applications. Mr. Freedman managed this project task. Contract Budget/Fees: $593,822 <br />