|
STANDARD FORM 330 (REV. 8/2016)
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />
<br />
<br />
<br />13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Burton H. Hersh, AIA, LEED Green Assoc. Principal Architect a. TOTAL b. WITH CURRENT FIRM 39.1 12.1
<br /> 15. FIRM NAME AND LOCATION (City and State) Burton Hersh Architects, P.A. (Coral Gables, Florida)
<br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Bachelor of Architecture/University of Miami/1978 State of Florida/AR-9040/Registered Architect/1981
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) • Member of the American Institute of Architects, # 30013601
<br />• Member of the Coral Gables Business Improvement District Board of Directors
<br />• Former Chairman of the City of Coral Gables Board of Architects
<br />• Former President of the Coral Gables Business Improvement District Board of Directors
<br />• Former Vice-President and Member of the Lotus House Board of Directors
<br />• Honor Award of Excellence - Non-Hotel/Fast Casual Category for Bakan Restaurant, awarded by the American
<br />Institute of Architects (AIA) Miami Chapter, Greater Miami & The Beaches Hotel Association, and Oberhausen
<br />Marketing & Public Relations
<br />• SANDI Design Excellence Award in Corporate Design of SABMiller Headquarters, awarded by the International
<br />Interior Design Association (IIDA) South Florida Chapter
<br />• City Beautiful Award - Outstanding Restaurant Dining Room for Seasons 52, awarded by the Coral Gables Chamber
<br />of Commerce
<br />• City Beautiful Award - Outstanding Exterior Design for Por Fin Restaurant, awarded by the Coral Gables Chamber of
<br />Commerce
<br />• Merit Award - Commercial, Office and Industrial Category for Miami Lakes Corporate Plaza, awarded by the Miami
<br />Herald and the Builders Association of South Florida
<br />
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Lightspeed Facility 311 & 911 Support Area Renovation
<br />Sweetwater, Florida
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Ongoing Ongoing
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Architectural, Interior Design and coordination of Civil, Structural and MEP Engineering Services for a new support
<br />space, restrooms, locker rooms and lounge for Miami-Dade County 311 & 911 services, which can be used in
<br />countywide emergency situations as sleeping areas for essential personnel. A second floor slab was designed to
<br />accommodate future mechanical equipment to supply the entire building.
<br />• Area: 8,836 Sq.Ft.
<br />• Cost: $2,000,000
<br />• Specific Role: Principal Architect and point of contact.
<br />b.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED 120 Giralda Avenue Shell Improvements
<br />Coral Gables, Florida
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2019 2019
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Architectural and coordination of Civil, Structural and MEP engineering services - Exterior, Interior and roof
<br />improvements to the 120 Giralda Avenue building. Restoration and renovations to the original building and a later
<br />addition to prepare the space as commercial and office shell space.
<br />• Area: 14,524 Sq.Ft.
<br />• Cost: $3,130,107.28
<br />• Specific Role: Principal Architect and point of contact.
<br />
<br />c.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED 2728 Ponce de Leon Shell Improvements
<br />Coral Gables, Florida
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2020 2020
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Architectural coordination of Civil, Structural and MEP Engineering Services - Partial demolition of an existing structure,
<br />rehabilitation of the remaining portion and construction of new building. All work was done to provide a shell space for
<br />future tenants, with outdoor space for potential restaurant open air dining areas.
<br />• Area: 10,700 Sq.Ft.
<br />• Cost: $1,450,000
<br />• Specific Role: Principal Architect and point of contact.
<br />
|