My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Chen Moore and Associates (cma)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Chen Moore and Associates (cma)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 12:05:05 PM
Creation date
8/21/2020 12:02:49 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
317
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STANDARD FORM 330 (REV. 8/2016) <br /> <br />d. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Redevco and LBW Offices at Gables Pointe Plaza <br />Coral Gables, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2015 2017 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Architectural, Interior Design and coordination of Civil, Landscape, Structural and MEP Engineering Services – <br />Construction of new building on a vacant site to be used as a community center to serve the needs of the McFarlane <br />community, and the new corporate offices for the developer, who has been intricately involved in the development of the <br />community. <br />• Area: 18,761 Sq.Ft. <br />• Cost: $800,000 <br />• Specific Role: Principal Architect and point of contact. <br />e. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />9700 Dadeland Office Building Lobby and Common Area Renovations <br />Miami, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2016 2016 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Architectural, Interior Design and coordination of Structural and MEP Engineering Services - Redesign the lobby and <br />common areas throughout all eleven stories of the building. Demolished the existing lobby and created a new <br />two-story lobby with a curtain wall system utilizing low-e glazing, allowing for a light-filled entrance <br />that also reduced the heat transmission into the enclosed space. <br />• Area: 18,000 Sq.Ft. <br />• Cost: $2,000,000.00 <br />• Specific Role: Principal Architect and point of contact. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.