Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Jose Acosta, P.E., F.ASCE <br />13. ROLE IN THIS CONTRACT <br />Principal in Charge 14. YEARS EXPERIENCE <br />a. TOTAL 21 b. WITH CURRENT FIRM 9 <br />15. FIRM NAME AND LOCATION (City and State) <br />Chen Moore and Associates, Miami, FL <br />16. EDUCATION (Degree and Specialization) <br />Master of Business Administration / Master of Business <br />Administration/ Bachelor of Science / Civil Engineering <br />Bachelor of Science / Architectural Engineering <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />FL / Professional Engineer <br /> / Natl. Council of Examiners for Eng. & Surveying <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Mr. Acosta has over 21 years of design and project management experience in various industries, including municipal continuing <br />service contracts, K-12 education, higher education, healthcare, transportation, and commercial/residential/industrial private <br />development. His background includes neighborhood improvement projects, streetscape enhancements, utility relocation, on- and off- <br />site infrastructure design, bidding assistance, and construction administration services for several municipalities throughout Miami- <br />Dade, Broward and Palm Beach Counties. <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Miami Beach Sunset Islands 3 & 4 ROW Improvement Program <br />Miami Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (If applicable) <br />2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Principal. CMA provided civil engineering and landscape architecture for the utility infrastructure and roadway reconstruction of <br />two islands (Sunset Islands 3 and 4) off the Miami Beach west coast, along the inter-coastal waterway. The project consists of <br />the replacement of 8" potable water mains, the lining of existing sanitary sewer mains, a completely new storm water drainage <br />system, including discharge pumps and outfalls, the undergrounding of all existing overhead utilities, new service connections to <br />all properties, complete roadway reconstruction and grading with new pavement section and curb, landscaping, signage and <br />striping. Cost: $7.75 million; Fee: $790,153.76 <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />NMB-Highland Drive Roundabout <br />N Miami Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br />2018 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Principal. CMA assisted the City of North Miami Beach with the design of a roundabout at the intersection of NE 137th Street and <br />Highlands Drive, in order to reduce vehicular speed along Highlands Drive. The CMA team provided survey and geotechnical <br />exploration; survey/as-built drawing review from local utilities; civil engineering regarding the site and initial site plan; and design <br />and plan preparation including the demolition, earthwork, paving, grading, drainage, water, signing and marking, details, <br />specifications and stormwater pollution prevention plans. Cost: $90,000; Fee: $40,435 <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Merrick Manor Sanitary Sewer Ph I <br />Coral Gables, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (If applicable) <br />2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Principal Project Manager. CMA provided preliminary civil engineering and related services for the Merrick Manor Sanitary Sewer <br />project for Coral Gables. The project consists of the design, permitting and construction administration effort for the replacement <br />and upsizing of just under 1,600 LF of existing gravity sewer (8”/10” VCP per City of Coral Gables As-builts to 12”) in an existing <br />commercial district in the City of Coral Gables in support of a development located on the corner of Altara Avenue and LeJeune <br />Road by the Astor Companies. CMA was responsible for providing Land Surveying and Geotechnical Engineering, Subsurface <br />Utility Engineering Services; Utility Coordination and Preliminary Design; Final Engineering; Government Permitting; and <br />Construction Observation and Administration Assistance. Fee: $ 24,900.00 <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Lake Sarah/Lake Adele Stormwater & Roadway Improvements <br />Miami Lakes, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (If applicable) <br />2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Manager. CMA implemented drainage and pavement improvements. These improvements were identified on the most <br />recent Town of Miami Lakes Stormwater Master Plan. The drainage basins total approximately 20 acres of an existing residential <br />neighborhood near Lakes Sarah, Adele, Suzie and Hilda in southern Miami Lakes near Miami Lakeway South and Ludlam Road. <br />Services include utility coordination, schematic and final design phases, government permitting, bidding assistance, construction <br />administration and statements of work completion. The final design included approximately 2,060 LF of exfiltration trench, <br />approximately 3,750 LF of solid stormwater pipe, 54 inlets and 5 control structures which discharge via existing outfalls. Fee: <br />116,155.00 <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Skilled Nursing Facility Doral <br />Doral, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br />Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Principal. CMA is the civil engineer and landscape architect of record for the Skilled Nursing Facility, located in Doral, Florida. <br />The proposed development is situated on a 2.9-acre parcel and consists of a 240-bed, six-story skilled nursing facility, a 5-story <br />medical office building, and a multi-level parking garage. CMA is designing and permitting the water, sewer, and drainage <br />associated with the project, which includes offsite roadway and utility improvements, including a 12” water main extension, 8” <br />gravity sanitary sewer main extension, roadway reconstruction, and a proposed roundabout. Fee: $ 119,425.00 <br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2