|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Gregory Mendez, P.E.
<br />13. ROLE IN THIS CONTRACT
<br />Project Manager 14. YEARS EXPERIENCE
<br />a. TOTAL 22 b. WITH CURRENT FIRM 6
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Chen Moore and Associates, Miami, FL
<br />16. EDUCATION (Degree and Specialization)
<br />Bachelor of Science / Architectural Engineering
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />FL / Professional Engineer
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Mr. Mendez has more than 22 years of civil engineering experience in site and infrastructural development type projects for public
<br />and private facilities. He has extensive utilities design experience and is also very experienced with fast track projects. His experience
<br />includes water, drainage and sewer designs, design reviews, managing designs and construction budgets, managing field inspection
<br />staff and managing client relations.
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Miami Beach Sunset Islands 3 & 4 ROW Improvement Program
<br />Miami Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2015
<br />CONSTRUCTION (If applicable)
<br />2019
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project Manager. CMA provided civil engineering and landscape architecture for the utility infrastructure and roadway
<br />reconstruction of two islands (Sunset Islands 3 and 4) off the Miami Beach west coast, along the inter-coastal waterway. The
<br />project consists of the replacement of 8" potable water mains, the lining of existing sanitary sewer mains, a completely new storm
<br />water drainage system, including discharge pumps and outfalls, the undergrounding of all existing overhead utilities, new service
<br />connections to all properties, complete roadway reconstruction and grading with new pavement section and curb, landscaping,
<br />signage and striping. Cost: $7.75 million; Fee: $790,153.76
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Doral White Course Park for City of Doral - RFQ 2019-43
<br />Doral, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project Manager. CMA is providing architecture and engineering services and related disciplines for the City of Doral, Florida.
<br />CMA will prepare full design documents, permitting, bid support and construction administration support services for a new 2.7ac.
<br />(approximate) park on the north side of NW 41st Street and approximately at the theoretical NW 84th Avenue, within the
<br />Downtown Doral South development. The park will include a shaded playground, a flexible event plaza, outdoor fitness stations,
<br />an off-leash fenced dog area, multi-purpose greenspace, a restroom building with IT closet, rain gardens picnic shelters, space
<br />for public art, walkways and lighting. CMA's scope of services includes Design Development, Construction Documents, Bidding
<br />and Permitting, and Construction Administration. Fee: $ 289,740.61
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />USSOUTHCOM Alterations-West Parking Area
<br />Doral, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If applicable)
<br />2016
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project Manager. Design Build project for improvements to an existing parking lot at USSOUTHCOM for the Army Corps. Of
<br />Engineers (ACOE) in Doral, FL. The project consisted of the demolition of some existing curb, sod and paved areas in order to
<br />construct additional parking spaces and parking lot accesses. The scope of work included paving, grading, drainage, signage
<br />and pavement markings. Fee: $ 22,950.00
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Park Dr 16-inch Water Main Replacement
<br />Bal Harbour, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019
<br />CONSTRUCTION (If applicable)
<br />Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project Manager. CMA is providing Professional Engineering Services to provide limited construction administration support
<br />services during the construction phase for the Park Drive 16-inch water main replacement. CMA will attend pre-construction
<br />meetings, perform shop drawing reviews, perform site visits and inspections, and respond to RFIs. Fee: $150,660
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />NMB-Highland Drive Roundabout
<br />N Miami Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If applicable)
<br />2016
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project Manager. CMA assisted the City of North Miami Beach with the design of a roundabout at the intersection of NE 137th
<br />Street and Highlands Drive, in order to reduce vehicular speed along Highlands Drive. The CMA team provided survey and
<br />geotechnical exploration; survey/as-built drawing review from local utilities; civil engineering regarding the site and initial site plan;
<br />and design and plan preparation including the demolition, earthwork, paving, grading, drainage, water, signing and marking,
<br />details, specifications and stormwater pollution prevention plans. Cost: $90,000; Fee: $40,435
<br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />
|