Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Gregory Mendez, P.E. <br />13. ROLE IN THIS CONTRACT <br />Project Manager 14. YEARS EXPERIENCE <br />a. TOTAL 22 b. WITH CURRENT FIRM 6 <br />15. FIRM NAME AND LOCATION (City and State) <br />Chen Moore and Associates, Miami, FL <br />16. EDUCATION (Degree and Specialization) <br />Bachelor of Science / Architectural Engineering <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />FL / Professional Engineer <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Mr. Mendez has more than 22 years of civil engineering experience in site and infrastructural development type projects for public <br />and private facilities. He has extensive utilities design experience and is also very experienced with fast track projects. His experience <br />includes water, drainage and sewer designs, design reviews, managing designs and construction budgets, managing field inspection <br />staff and managing client relations. <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Miami Beach Sunset Islands 3 & 4 ROW Improvement Program <br />Miami Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (If applicable) <br />2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Manager. CMA provided civil engineering and landscape architecture for the utility infrastructure and roadway <br />reconstruction of two islands (Sunset Islands 3 and 4) off the Miami Beach west coast, along the inter-coastal waterway. The <br />project consists of the replacement of 8" potable water mains, the lining of existing sanitary sewer mains, a completely new storm <br />water drainage system, including discharge pumps and outfalls, the undergrounding of all existing overhead utilities, new service <br />connections to all properties, complete roadway reconstruction and grading with new pavement section and curb, landscaping, <br />signage and striping. Cost: $7.75 million; Fee: $790,153.76 <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Doral White Course Park for City of Doral - RFQ 2019-43 <br />Doral, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br />Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Manager. CMA is providing architecture and engineering services and related disciplines for the City of Doral, Florida. <br />CMA will prepare full design documents, permitting, bid support and construction administration support services for a new 2.7ac. <br />(approximate) park on the north side of NW 41st Street and approximately at the theoretical NW 84th Avenue, within the <br />Downtown Doral South development. The park will include a shaded playground, a flexible event plaza, outdoor fitness stations, <br />an off-leash fenced dog area, multi-purpose greenspace, a restroom building with IT closet, rain gardens picnic shelters, space <br />for public art, walkways and lighting. CMA's scope of services includes Design Development, Construction Documents, Bidding <br />and Permitting, and Construction Administration. Fee: $ 289,740.61 <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />USSOUTHCOM Alterations-West Parking Area <br />Doral, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br />2016 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Manager. Design Build project for improvements to an existing parking lot at USSOUTHCOM for the Army Corps. Of <br />Engineers (ACOE) in Doral, FL. The project consisted of the demolition of some existing curb, sod and paved areas in order to <br />construct additional parking spaces and parking lot accesses. The scope of work included paving, grading, drainage, signage <br />and pavement markings. Fee: $ 22,950.00 <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Park Dr 16-inch Water Main Replacement <br />Bal Harbour, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (If applicable) <br />Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Manager. CMA is providing Professional Engineering Services to provide limited construction administration support <br />services during the construction phase for the Park Drive 16-inch water main replacement. CMA will attend pre-construction <br />meetings, perform shop drawing reviews, perform site visits and inspections, and respond to RFIs. Fee: $150,660 <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />NMB-Highland Drive Roundabout <br />N Miami Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br />2016 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Manager. CMA assisted the City of North Miami Beach with the design of a roundabout at the intersection of NE 137th <br />Street and Highlands Drive, in order to reduce vehicular speed along Highlands Drive. The CMA team provided survey and <br />geotechnical exploration; survey/as-built drawing review from local utilities; civil engineering regarding the site and initial site plan; <br />and design and plan preparation including the demolition, earthwork, paving, grading, drainage, water, signing and marking, <br />details, specifications and stormwater pollution prevention plans. Cost: $90,000; Fee: $40,435 <br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />