Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Brent Whitfield, P.E., ENV SP <br />13. ROLE IN THIS CONTRACT <br />Engineering Design 14. YEARS EXPERIENCE <br />a. TOTAL 16 b. WITH CURRENT FIRM 3 <br />15. FIRM NAME AND LOCATION (City and State) <br />Chen Moore and Associates, West Palm Beach, FL <br />16. EDUCATION (Degree and Specialization) <br />Master of Science / Civil Engineering <br />Bachelor of Science / Civil Engineering <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />FL / Professional Engineer <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Brent Whitfield, P.E., ENV SP is the Director of Water Resources for CMA. With 16 years of professional experience, Mr. Whitfield <br />has worked for a variety of public sector clients at the City, County and State level. His experience includes tasks as varied as <br />hydrologic and hydraulic modeling related to environmental and flood protection studies and detailed engineering design and <br />construction oversight for roadway, water, sewer, and stormwater infrastructure. Mr. Whitfield has provided infrastructure solutions in <br />various settings from residential neighborhoods to commercial airports. As a life-long resident of Florida, Mr. Whitfield has maintained <br />a commitment to serving the community both professionally and personally serving as an appointed board member for a municipal <br />advisory board with maintaining involvement in the American Society of Civil Engineers (ASCE), the Florida Engineering Society (FES) <br />and Leadership Florida. Mr. Whitfield holds bachelor’s and master’s Degrees in Civil Engineering from the University of Florida. <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Worth Avenue - 400 Block <br />Town of Palm Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If applicable) <br />2018 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Manager. CMA was requested by the Town of Palm Beach to provide civil engineering and bidding assistance services <br />for the installation of drainage infrastructure and underground utilities in the 400 block of Worth Avenue. The project was identified <br />by an earlier study, the Mid-Town Drainage Basin Report, which documented the benefits to flood protection that could be realized <br />by the installation of a 1,050-ft long, 36-inch diameter drainage trunk-line connecting the 300 block of Worth Avenue more directly <br />to the D-7 Pump Station. As part of this effort, CMA also designed the replacement of the 6-inch AC water main and lining <br />replacement of the 8-inch and 12-inch VCP sewer. Cost: $1,500,000 Fee: $187,330 <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Neighborhood Street Program - District 4 Year 1 <br />Lake Worth, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (If applicable) <br />2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Manager. As Lead Project Engineer and Project Manager, Mr. Whitfield is providing engineering design for improvements <br />to roadways, pedestrian facilities, drainage facilities and underground water utilities in District 4 of the City of Lake Worth. The <br />project is funded by a voter approved bond and as such incorporates significant public outreach in addition to the typical <br />engineering project components preparing construction contract documents and procuring permits. Cost: $ 1,435,852.71; Fee: $ <br />442,880.00 <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Southgate Boulevard & Rock Island Force Main <br />Margate, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br />2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Director of Water Resources/Sr. Engineer. CMA is assisting Carollo Engineers with installing approximately 6,000 linear feet of <br />sanitary sewer force main to provide system redundancy. CMA is responsible for the survey, geotechnical engineering, <br />subsurface utility investigation, design, permitting and bidding assistance. The firm is also providing hydraulic modeling services <br />to verify the impacts to other areas of the sewer transmission system with the implementation of the new force main. Fee: <br />$177,041 <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />26th Street and Flagler Drive Storm Water Improvements <br />West Palm Beach, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br />Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Manager CMA is providing the stormwater and roadway design for the 26th Street and Flagler Drive Stormwater <br />Improvements project. Our design involves the replacement of an existing 54-inch stormwater trunk line and the reconfiguration <br />of the roadway. The current cross-section of the road is four-lane divided by a median, whereas the proposed cross-section will <br />be two-lanes with a protected pedestrian and bicycle facility and significant plantings. With a reduction in impervious area and <br />the use of bio-swales, this design will be a significant green infrastructure project. Fee: $141,850 <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />SUA Hood Rd Office Complex Replacement R1832 <br />Palm Beach Gardens, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br />Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Director of Water Resources/Sr. Engineer. CMA was contracted by Seacoast Utility Authority (SUA) for the civil engineering and <br />landscape architecture services for the Hood Road Office Complex Replacement Project (HROC). The project involves <br />replacement of the existing 14,000 SF Administrative Building with a new 16,000 SF building; replacement of the existing 3,300 <br />SF Operations and Maintenance Building with a new 8,625 SF building; and replacement of the existing 12,000 SF Warehouse <br />and Fleet Maintenance Building with a new 15,000 SF building. CMA performed design, permitting and construction administration <br />services for the new complex design which included a fire suppression, potable water, sanitary sewer, drainage, paving, <br />hardscape, landscape and irrigation on site and a proposed turn lane off site located in Palm Beach County right-of-way. Fee: <br />$98,285 <br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2