E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Daniel Davila, P.E.
<br />13. ROLE IN THIS CONTRACT
<br />Cost Estimating and Permitting
<br />
<br />14. YEARS EXPERIENCE
<br />a. TOTAL 21 b. WITH CURRENT FIRM 9
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Chen Moore and Associates, Fort Lauderdale, FL
<br />16. EDUCATION (Degree and Specialization)
<br />Bachelor of Science / Civil Engineering
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />FL / Professional Engineer
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Mr. Davila has over 20 years of civil engineering experience. His experience includes water and wastewater facilities, facilities
<br />planning, utilities master planning, infrastructure renewal, construction management and rate and financial studies. Mr. Davila has
<br />assisted numerous clients that range from municipalities, counties, federal agencies, healthcare districts, residential developers and
<br />commercial developers to educational institutions. He has been the contract manager for small projects as well as large complex
<br />projects managing millions of dollars in design fees and several subconsultants. Mr. Davila has been the contract manager for several
<br />government agencies including St. Lucie County; City of Plantation; St Lucie County School Board; Memorial Healthcare System;
<br />Village of Wellington; City of West Palm Beach; and Palm Beach County.
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Broward County UAZ 110/111 & 113 Water Sewer Improvements 113B
<br />(RFP No. R1356803P1)
<br />Lauderdale Lakes, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Sr. Engineer. The Water and Sanitary Sewer Improvements for the UAZ 110/111 & 113 Project include the improvements to the
<br />existing water distribution system, sanitary sewer system, and transmission systems within the project area along with the
<br />restoration of surface areas disturbed for the construction of said improvements. All projects combined a total area of over 1000
<br />acres within multiple cities. The project is currently under construction, in which CMA is performing construction administration
<br />for three separate bid packages. Total Project Fee $11,171,568.83; Fee for 113B Project: $4,357,958.51
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Emergency Bypass 48” Forcemain
<br />Fort Lauderdale, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project Manager. CMA is responsible for the design, permitting, and construction observation of the replacement of the City of
<br />Fort Lauderdale main transmission line going into the wastewater treatment plant. The new line consists of more than 22,000
<br />linear feet of new pipe which will be installed via 12 horizontal directional drills (HDD) that range between 1,700 and 3,000 linear
<br />feet each to a depth of up to 70 feet. Fee: $ 1,200,000.00
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Ft Lauderdale FM Rehab, HDD & Swageline (1-4)
<br />Fort Lauderdale, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (If applicable)
<br />2018
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project Manager. CMA was the prime consultant for the 30” Emergency Force Main Rehabilitation project in the City of Fort
<br />Lauderdale. The contract was divided into four (4) phases within the City of Fort Lauderdale. The nearly 20,000 linear feet of
<br />pipeline was rehabilitated through a combination of swagelining, directional drilling, and traditional open cut installation over these
<br />four phases. CMA provided planning, design, permitting, and engineering services during construction. Environmental
<br />compliance, subaqueous crossing, public involvement, and maintenance of traffic in the busy Sistrunk and Himmarshee Business
<br />Districts were some of the additional project complexities. Cost: $14M; Fee: $836,710
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Stormwater Master Plan Modeling and Design Implementation
<br />Ft Lauderdale, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />CMA is providing engineering design services for the Stormwater Improvement Master Plan Modeling and Design Implementation
<br />Project under the City of Fort Lauderdale. CMA is responsible for the planning, modeling, design, and permitting for the proposed
<br />stormwater improvements within the Victoria Park neighborhood, which was identified as one of the 7 priority neighborhoods with
<br />the City. A combination of multiple improvements to the stormwater management system have been developed to alleviate the
<br />existing flooding issues within the neighborhood. The proposed stormwater improvements within the Victoria Park neighborhood
<br />include separate alternatives for the eastern and western portions of the neighborhood. Within the western portions of the Victoria
<br />Park neighborhood, the proposed stormwater improvements consist of installing additional pipe interconnectivity of various
<br />existing independent drainage networks located throughout the neighborhood.
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Broward County UAZ 110/111 & 113 Water Sewer Improvements
<br />110/111 (RFP No. R1356803P1)
<br />Lauderdale Lakes, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Sr. Engineer. The Water and Sanitary Sewer Improvements for the UAZ 110/111 & 113 Project will include the improvements to
<br />the existing water distribution system, sanitary sewer system, and transmission systems within the project area along with the
<br />restoration of surface areas disturbed for the construction of said improvements. All projects combined a total area of over 1000
<br />acres within multiple Cities. Cost: $ 80,000,000.00; Fee $ 11,171,568.83
<br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2
|