Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Manuel Caamano <br />13. ROLE IN THIS CONTRACT <br />Construction Administration <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL 17 b. WITH CURRENT FIRM 2 <br />15. FIRM NAME AND LOCATION (City and State) <br />Chen Moore and Associates, Fort Lauderdale, FL <br />16. EDUCATION (Degree and Specialization) <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br /> 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Mr. Caamano is a construction specialist with over 15 years of project experience. His responsibilities include coordination and <br />monitoring of construction activities including governmental projects and site development for residential, commercial and industrial <br />use projects. He serves as liaison to owners, contractors, subcontractors, residents and governmental agencies. Additional <br />responsibilities include overseeing the review/processing of change orders, progress payments and reports, and representation of <br />owners and engineers at pre-construction meetings and other related conferences. <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Ft Lauderdale FM Rehab, HDD & Swageline (1-4) <br />Fort Lauderdale, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If applicable) <br />2018 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Construction Specialist. CMA was the prime consultant for the 30” Emergency Force Main Rehabilitation project in the City of <br />Fort Lauderdale. The contract was divided into four (4) phases within the City of Fort Lauderdale. The nearly 20,000 linear feet <br />of pipeline was rehabilitated through a combination of swagelining, directional drilling, and traditional open cut installation over <br />these four phases. CMA provided planning, design, permitting, and engineering services during construction. Environmental <br />compliance, subaqueous crossing, public involvement, and maintenance of traffic in the busy Sistrunk and Himmarshee Business <br />Districts were some of the additional project complexities. Cost: $14M; Fee: $836,710 <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Broward County UAZ 110/111 & 113 Water Sewer Improvements 113B <br />(RFP No. R1356803P1) <br />Lauderdale Lakes, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br /> <br />CONSTRUCTION (If applicable) <br />Ongoing <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Construction Specialist. The Water and Sanitary Sewer Improvements for the UAZ 110/111 & 113 Project include the <br />improvements to the existing water distribution system, sanitary sewer system, and transmission systems within the project area <br />along with the restoration of surface areas disturbed for the construction of said improvements. All projects combined a total area <br />of over 1000 acres within multiple cities. The project is currently under construction, in which CMA is performing construction <br />administration for three separate bid packages. Total Project Fee $11,171,568.83; Fee for 113B Project: $4,357,958.51 <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Emergency Bypass 48” Forcemain <br />Fort Lauderdale, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br />Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Construction Specialist. CMA is responsible for the design, permitting, and construction observation of the replacement of the <br />City of Fort Lauderdale main transmission line going into the wastewater treatment plant. The new line consists of more than <br />22,000 linear feet of new pipe which will be installed via 12 horizontal directional drills (HDD) that range between 1,700 and 3,000 <br />linear feet each to a depth of up to 70 feet. Fee: $ 1,200,000.00 <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Hillsboro Beach Water Main Replacement Design/Construction <br />Administration <br />Hillsboro Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (If applicable) <br />2015 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Construction Specialist. CMA is providing engineering design services and construction administration for water improvement <br />needs for the Town of Hillsboro Beach along A1A from SE 10th Street to the Hillsboro Inlet. CMA previously modeled and <br />completed a system evaluation report determining the facilities in need of replacement. The improvements will include <br />replacement of parallel water mains along the barrier island and has taken into consideration future needs, environment, pipe <br />types, various installation methods, project coordination, and funding. Fee $409,582 <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Fort Lauderdale Forcemain Las Olas Phase II - Job No. 19FL016 <br />Fort Lauderdale, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br />Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Construction Specialist. CMA was responsible for the design and permitting of a new 16-inch diameter force main under Las Olas <br />Boulevard, that extends from Lido Drive to Merle Fogg Park. The project is a Design-Build led by Murphy Pipeline which is <br />currently under construction. The total length is 3,200 linear feet and it was designed utilizing high density polyethylene pipe <br />installed via horizontal directional drilling (HDD) for a total of 4 drills. Las Olas Boulevard is a busy corridor with multiple utilities <br />including watermains, sewer, storm drainage, gas line and electrical duct banks. CMA also performed dewatering calculations <br />and obtained dewatering permits required due to challenging high-water table only two feet below finished grade. Fee: $115,000 <br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />