Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Jose McCray <br />13. ROLE IN THIS CONTRACT <br />Construction Administration 14. YEARS EXPERIENCE <br />a. TOTAL 39 b. WITH CURRENT FIRM 8 <br />15. FIRM NAME AND LOCATION (City and State) <br />Chen Moore and Associates, Miami, FL <br />16. EDUCATION (Degree and Specialization) <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br /> 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Mr. McCray is a senior inspector for Chen Moore and Associates. Mr. McCray has nearly 40 years of construction experience, from <br />surveying through project management. His present responsibilities include coordination and monitoring of construction activities <br />including governmental projects and site development for residential, commercial, and industrial use projects. He serves as liaison to <br />owners, contractors, subcontractors, residents, and governmental agencies. Additional responsibilities include overseeing the <br />review/processing of change orders, progress payments and reports, and representation of owners and engineers at pre-construction <br />meetings and other related conferences. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Miami Beach Sunset Islands 3 & 4 ROW Improvement Program <br />Miami Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (If applicable) <br />2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Sr. Construction Specialist. CMA provided civil engineering and landscape architecture for the utility infrastructure and roadway <br />reconstruction of two islands (Sunset Islands 3 and 4) off the Miami Beach west coast, along the inter-coastal waterway. The <br />project consists of the replacement of 8" potable water mains, the lining of existing sanitary sewer mains, a completely new storm <br />water drainage system, including discharge pumps and outfalls, the undergrounding of all existing overhead utilities, new service <br />connections to all properties, complete roadway reconstruction and grading with new pavement section and curb, landscaping, <br />signage and striping. Cost: $7.75 million; Fee: $790,153.76 <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Lake Sarah/Lake Adele Stormwater & Roadway Improvements <br />Miami Lakes, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (If applicable) <br />2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Sr. Construction Specialist. CMA implemented drainage and pavement improvements. These improvements were identified on <br />the most recent Town of Miami Lakes Stormwater Master Plan. The drainage basins total approximately 20 acres of an existing <br />residential neighborhood near Lakes Sarah, Adele, Suzie and Hilda in southern Miami Lakes near Miami Lakeway South and <br />Ludlam Road. Services include utility coordination, schematic and final design phases, government permitting, bidding <br />assistance, construction administration and statements of work completion. The final design included approximately 2,060 LF of <br />exfiltration trench, approximately 3,750 LF of solid stormwater pipe, 54 inlets and 5 control structures which discharge via existing <br />outfalls. Fee: 116,155.00 <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Merrick Manor Sanitary Sewer Ph II <br />Coral Gables, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (If applicable) <br />2018 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Sr. Construction Specialist. CMA provided preliminary civil engineering and related services for the Merrick Manor Sanitary Sewer <br />project for Coral Gables. The project consists of the design, permitting and construction administration effort for the replacement <br />and upsizing of just under 1,600 LF of existing gravity sewer (8”/10” VCP per City of Coral Gables As-builts to 12”) in an existing <br />commercial district in the City of Coral Gables in support of a development located on the corner of Altara Avenue and LeJeune <br />Road by the Astor Companies. CMA was responsible for providing Land Surveying and Geotechnical Engineering, Subsurface <br />Utility Engineering Services; Utility Coordination and Preliminary Design; Final Engineering; Government Permitting; and <br />Construction Observation and Administration Assistance. Fee: $ 24,900.00 <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />NMB-Highland Drive Roundabout <br />N Miami Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br />2018 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Sr. Construction Specialist. CMA assisted the City of North Miami Beach with the design of a roundabout at the intersection of <br />NE 137th Street and Highlands Drive, in order to reduce vehicular speed along Highlands Drive. The CMA team provided survey <br />and geotechnical exploration; survey/as-built drawing review from local utilities; civil engineering regarding the site and initial site <br />plan; and design and plan preparation including the demolition, earthwork, paving, grading, drainage, water, signing and marking, <br />details, specifications and stormwater pollution prevention plans. Cost: $90,000; Fee: $40,435 <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Broward County UAZ 110/111 & 113 Water Sewer Improvements 113B <br />(RFP No. R1356803P1) <br />Lauderdale Lakes, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If applicable) <br />Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Sr. Construction Specialist. The Water and Sanitary Sewer Improvements for the UAZ 110/111 & 113 Project include the <br />improvements to the existing water distribution system, sanitary sewer system, and transmission systems within the project area <br />along with the restoration of surface areas disturbed for the construction of said improvements. All projects combined a total area <br />of over 1000 acres within multiple cities. The project is currently under construction, in which CMA is performing construction <br />administration for three separate bid packages. Total Project Fee $11,171,568.83; Fee for 113B Project: $4,357,958.51 <br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2