E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Michael Buick, P.E.
<br />13. ROLE IN THIS CONTRACT
<br />Engineering Design 14. YEARS EXPERIENCE
<br />a. TOTAL 18 b. WITH CURRENT FIRM 8
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Chen Moore and Associates, Miami, FL
<br />16. EDUCATION (Degree and Specialization)
<br />Bachelor of Science / Biosystems Engineering
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />FL / Professional Engineer
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Mr. Buick is a senior engineer in our Miami office and has over 13 years of experience in site development. His experience includes
<br />planning, design, permitting and construction administration of site infrastructure including site paving, grading and drainage and site
<br />utility plans for land development projects.
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Lake Sarah/Lake Adele Stormwater & Roadway Improvements
<br />Miami Lakes, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (If applicable)
<br />2018
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Sr. Engineer. CMA implemented drainage and pavement improvements. These improvements were identified on the most recent
<br />Town of Miami Lakes Stormwater Master Plan. The drainage basins total approximately 20 acres of an existing residential
<br />neighborhood near Lakes Sarah, Adele, Suzie and Hilda in southern Miami Lakes near Miami Lakeway South and Ludlam Road.
<br />Services include utility coordination, schematic and final design phases, government permitting, bidding assistance, construction
<br />administration and statements of work completion. The final design included approximately 2,060 LF of exfiltration trench,
<br />approximately 3,750 LF of solid stormwater pipe, 54 inlets and 5 control structures which discharge via existing outfalls. Fee:
<br />116,155.00
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Sunset Islands I & II
<br />Miami Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2011
<br />CONSTRUCTION (If applicable)
<br />2013
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Sr. Engineer. CMA was the prime consultant responsible for planning, design, permitting, bid and award and construction
<br />engineering and services for infrastructure improvements within the public right of way areas of the Sunset Islands I & II
<br />neighborhood of Miami Beach. Cost: $ 5,600,000.00; Fee: $ 322,623.00
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />East Bird Rd Corridor Sanitary Sewer Improvement
<br />Miami, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If applicable)
<br />2018
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Sr. Engineer. CMA provided civil engineering services for sewer improvements along the corridor of Bird Road (SW 40th Street)
<br />from Red Road (SW 57th Avenue) to Ludlam Road (SW 67th Avenue) within the commercial corridor, on both sides of the street,
<br />utilizing low pressure sewer design concepts. The project intended to connect various small commercial sites on both sides of
<br />the Bird Road Corridor, as well as the shopping center at the northwest corner of Red Road and Bird Road and nearby David
<br />Fairchild Elementary School, all of which are currently served by septic systems. The project included an initial engineering
<br />analysis phase with the preparation of a technical memorandum with options and recommendations for pump strategy, small and
<br />large pump station selection, power, maintenance, permitting considerations, etc Cost: $ 2,019,686.00; Fee: $ 199,186.50.
<br />
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />City Center Right-of-Way and Utility Improvement Project
<br />Miami Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2012
<br />CONSTRUCTION (If applicable)
<br />2015
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Sr. Engineer. Mr. Buick worked as part of the design team for the right-of-way improvement project for the City of Miami Beach.
<br />He oversaw the design, permitting and bidding of the proposed project. 9A description: CMA was the prime consultant and is
<br />responsible for providing surveying, planning, geotechnical investigation, design, permitting, preparation of construction
<br />documents, bid and award and construction engineering and inspection (CEI) services for infrastructure improvements within the
<br />public right-of-way (ROW) areas of the City Center neighborhood of Miami Beach. The project encompasses approximately
<br />24,000 LF of ROW infrastructure improvements including: 8,700 LF of 8-inchwater main replacements; sewer improvements,
<br />stormwater drainage improvements; paving & grading; roadway/traffic improvements (streets, sidewalks, curb and gutter,
<br />drainage, traffic control devices including striping, signing and channelization); streetscaping and landscaping enhancements;
<br />decorative, landscape and roadway lighting improvements; and roadway reconstruction. Cost: 21,200,000.00; Fee: $
<br />3,611,340.00
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Downtown Coral Springs Streetscaping
<br />Coral Springs, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2015
<br />CONSTRUCTION (If applicable)
<br />2015
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Sr. Engineer. CMA was contracted by the City of Coral Springs to assist the Coral Springs CRA in the planning, design, permitting,
<br />and construction support of various streetscaping improvements in Downtown Coral Springs. As the prime consultants, CMA
<br />provided civil engineering, landscape architecture, environmental permitting, and construction engineering and inspection
<br />services for the project. Cost: $ 4,100,000.00; Fee: 235,739.98