Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Michael Buick, P.E. <br />13. ROLE IN THIS CONTRACT <br />Engineering Design 14. YEARS EXPERIENCE <br />a. TOTAL 18 b. WITH CURRENT FIRM 8 <br />15. FIRM NAME AND LOCATION (City and State) <br />Chen Moore and Associates, Miami, FL <br />16. EDUCATION (Degree and Specialization) <br />Bachelor of Science / Biosystems Engineering <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />FL / Professional Engineer <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Mr. Buick is a senior engineer in our Miami office and has over 13 years of experience in site development. His experience includes <br />planning, design, permitting and construction administration of site infrastructure including site paving, grading and drainage and site <br />utility plans for land development projects. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Lake Sarah/Lake Adele Stormwater & Roadway Improvements <br />Miami Lakes, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If applicable) <br />2018 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Sr. Engineer. CMA implemented drainage and pavement improvements. These improvements were identified on the most recent <br />Town of Miami Lakes Stormwater Master Plan. The drainage basins total approximately 20 acres of an existing residential <br />neighborhood near Lakes Sarah, Adele, Suzie and Hilda in southern Miami Lakes near Miami Lakeway South and Ludlam Road. <br />Services include utility coordination, schematic and final design phases, government permitting, bidding assistance, construction <br />administration and statements of work completion. The final design included approximately 2,060 LF of exfiltration trench, <br />approximately 3,750 LF of solid stormwater pipe, 54 inlets and 5 control structures which discharge via existing outfalls. Fee: <br />116,155.00 <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Sunset Islands I & II <br />Miami Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2011 <br />CONSTRUCTION (If applicable) <br />2013 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Sr. Engineer. CMA was the prime consultant responsible for planning, design, permitting, bid and award and construction <br />engineering and services for infrastructure improvements within the public right of way areas of the Sunset Islands I & II <br />neighborhood of Miami Beach. Cost: $ 5,600,000.00; Fee: $ 322,623.00 <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />East Bird Rd Corridor Sanitary Sewer Improvement <br />Miami, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br />2018 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Sr. Engineer. CMA provided civil engineering services for sewer improvements along the corridor of Bird Road (SW 40th Street) <br />from Red Road (SW 57th Avenue) to Ludlam Road (SW 67th Avenue) within the commercial corridor, on both sides of the street, <br />utilizing low pressure sewer design concepts. The project intended to connect various small commercial sites on both sides of <br />the Bird Road Corridor, as well as the shopping center at the northwest corner of Red Road and Bird Road and nearby David <br />Fairchild Elementary School, all of which are currently served by septic systems. The project included an initial engineering <br />analysis phase with the preparation of a technical memorandum with options and recommendations for pump strategy, small and <br />large pump station selection, power, maintenance, permitting considerations, etc Cost: $ 2,019,686.00; Fee: $ 199,186.50. <br /> <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />City Center Right-of-Way and Utility Improvement Project <br />Miami Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2012 <br />CONSTRUCTION (If applicable) <br />2015 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Sr. Engineer. Mr. Buick worked as part of the design team for the right-of-way improvement project for the City of Miami Beach. <br />He oversaw the design, permitting and bidding of the proposed project. 9A description: CMA was the prime consultant and is <br />responsible for providing surveying, planning, geotechnical investigation, design, permitting, preparation of construction <br />documents, bid and award and construction engineering and inspection (CEI) services for infrastructure improvements within the <br />public right-of-way (ROW) areas of the City Center neighborhood of Miami Beach. The project encompasses approximately <br />24,000 LF of ROW infrastructure improvements including: 8,700 LF of 8-inchwater main replacements; sewer improvements, <br />stormwater drainage improvements; paving & grading; roadway/traffic improvements (streets, sidewalks, curb and gutter, <br />drainage, traffic control devices including striping, signing and channelization); streetscaping and landscaping enhancements; <br />decorative, landscape and roadway lighting improvements; and roadway reconstruction. Cost: 21,200,000.00; Fee: $ <br />3,611,340.00 <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Downtown Coral Springs Streetscaping <br />Coral Springs, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (If applicable) <br />2015 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Sr. Engineer. CMA was contracted by the City of Coral Springs to assist the Coral Springs CRA in the planning, design, permitting, <br />and construction support of various streetscaping improvements in Downtown Coral Springs. As the prime consultants, CMA <br />provided civil engineering, landscape architecture, environmental permitting, and construction engineering and inspection <br />services for the project. Cost: $ 4,100,000.00; Fee: 235,739.98 <br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />