E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Joel Brownsey, P.E.
<br />13. ROLE IN THIS CONTRACT
<br /> Field Inspection 14. YEARS EXPERIENCE
<br />a. TOTAL 20 b. WITH CURRENT FIRM 14
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Chen Moore and Associates, Fort Lauderdale, FL
<br />16. EDUCATION (Degree and Specialization)
<br />Bachelor of Arts / Urban Planning
<br />Bachelor of Science / Civil Engineering
<br />Associate of Science / Surveying and Mapping
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />FL / Engineer In Training
<br />FL / Professional Engineer
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Mr. Brownsey is responsible for site design, utility infrastructure design, preparing engineering reports and permits for both public and
<br />private development. Additionally, Mr. Brownsey has experience in utility coordination and construction engineering support for
<br />neighborhood improvement projects and utility transmission and distribution installation projects.
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Broward County UAZ 110/111 & 113 Water Sewer Improvements
<br />110/111 (RFP No. R1356803P1)
<br />Lauderdale Lakes, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Sr. Engineer. The Water and Sanitary Sewer Improvements for the UAZ 110/111 & 113 Project will include the improvements to
<br />the existing water distribution system, sanitary sewer system, and transmission systems within the project area along with the
<br />restoration of surface areas disturbed for the construction of said improvements. All projects combined a total area of over 1000
<br />acres within multiple Cities. Cost: $ 80,000,000.00; Fee $ 11,171,568.83
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Broadview Park NIP - Bid Package 1
<br />Broward County, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2005
<br />CONSTRUCTION (If applicable)
<br />2005
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Sr. Engineer. The Broadview Park Neighborhood Improvement Project (BPNIP) was the last of the neighborhood infrastructure
<br />improvements projects carried out by Broward County in the unincorporated areas, located SW of State Road 7 and Davie
<br />Boulevard. The project included improvements to the drainage, water, sewer, and roadway systems. Cost: $11,610,029; Fee: $
<br />1,028,198
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Riviera Beach NIP's
<br />Riviera Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (If applicable)
<br />2018
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Sr. Engineer. The City of Riviera Beach contracted CMA to perform the roadway, sidewalk, drainage, water, and sewer
<br />improvements as part of a neighborhood improvement program. The scope of services included field investigation, sidewalk
<br />condition assessment, utility coordination, design, permitting, and public information. The design was completed on an
<br />accelerated schedule to fulfill the City's bond requirements. Cost: $ 5,598,234.25; Fee: $ 407,385.00
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Reclaimed Watermain Project
<br />Pompano Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Sr. Engineer. Lighthouse Point / Pompano Beach Reclaimed Water System CMA designed approximately 30,000 linear feet of
<br />reclaimed water distribution in the City of Lighthouse Point. The design is part of the City of Pompano Beach reclaimed water
<br />system expansion and it is located adjacent, just immediately south of the BCWWS North County Reclaimed Water expansion
<br />project. Fee: $ 35,900
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Lift Station 21
<br />Pompano Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2012
<br />CONSTRUCTION (If applicable)
<br />2013
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Sr. Engineer. CMA was responsible for the design, permitting and construction administration for the relocation of the existing LS
<br />21 (master pump station) serving a majority of the City of Pompano Beach barrier island. After completing the Basis of Design
<br />Report, Chen Moore and Associates proposed a variety of options to handle the approximately 4,700 GPM existing flow and
<br />conducted follow-up odor studies for specific design purposes. The design options included in-line booster and submersible
<br />pumps with variable frequency drives and liquid and vapor phase treatments. Additional concerns included odor control,
<br />dewatering contamination and electrical supply and generation. The final design a submersible lift station coupled with biological
<br />vapor phase odor control and strategic chemical liquid phase odor control. Cost: $ 3,400,000; Fee: $ 533,724
<br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2
|