E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Nicholas Karpathy, E.I., ENV SP
<br />13. ROLE IN THIS CONTRACT
<br /> Bidding 14. YEARS EXPERIENCE
<br />a. TOTAL 3 b. WITH CURRENT FIRM 3
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Chen Moore and Associates, Miami, FL
<br />16. EDUCATION (Degree and Specialization)
<br />Bachelor of Science / Civil Engineering
<br />Master of Engineering / Civil Engineering
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />FL / Engineer In Training
<br /> 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Mr. Karpathy serves as Associate Engineer in CMA’s Miami office. His experience includes reviewing drainage shop drawings;
<br />creating take-offs for drainage structure installations; managing heavy equipment usage, transportation, maintenance and repairs;
<br />and creating construction plans for assembly of retaining walls. He holds a Bachelor of Science degree from the University of Miami.
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />NMB-Highland Drive Roundabout
<br />N Miami Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If applicable)
<br />2018
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Associate Engineer. CMA assisted the City of North Miami Beach with the design of a roundabout at the intersection of NE 137th
<br />Street and Highlands Drive, in order to reduce vehicular speed along Highlands Drive. The CMA team provided survey and
<br />geotechnical exploration; survey/as-built drawing review from local utilities; civil engineering regarding the site and initial site plan;
<br />and design and plan preparation including the demolition, earthwork, paving, grading, drainage, water, signing and marking,
<br />details, specifications and stormwater pollution prevention plans. Cost: $90,000; Fee: $40,435
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Miami Beach Sunset Islands 3 & 4 ROW Improvement Program
<br />Miami Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2015
<br />CONSTRUCTION (If applicable)
<br />2019
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Associate Engineer. CMA provided civil engineering and landscape architecture for the utility infrastructure and roadway
<br />reconstruction of two islands (Sunset Islands 3 and 4) off the Miami Beach west coast, along the inter-coastal waterway. The
<br />project consists of the replacement of 8" potable water mains, the lining of existing sanitary sewer mains, a completely new storm
<br />water drainage system, including discharge pumps and outfalls, the undergrounding of all existing overhead utilities, new service
<br />connections to all properties, complete roadway reconstruction and grading with new pavement section and curb, landscaping,
<br />signage and striping. Cost: $7.75 million; Fee: $790,153.76
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Park Dr 16 inch Water Main Replacement
<br />Bal Harbour, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Associate Engineer. CMA is providing Professional Engineering Services to provide limited construction administration support
<br />services during the construction phase for the Park Drive 16-inch water main replacement. CMA will attend pre-construction
<br />meetings, perform shop drawing reviews, perform site visits and inspections, and respond to RFIs. Fee: $ 150,660.00
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Merrick Manor Sanitary Sewer Ph I
<br />Coral Gables, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017
<br />CONSTRUCTION (If applicable)
<br />2018
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Associate Engineer. CMA provided preliminary civil engineering and related services for the Merrick Manor Sanitary Sewer project
<br />for Coral Gables. The project consists of the design, permitting and construction administration effort for the replacement and
<br />upsizing of just under 1,600 LF of existing gravity sewer (8”/10” VCP per City of Coral Gables As-builts to 12”) in an existing
<br />commercial district in the City of Coral Gables in support of a development located on the corner of Altara Avenue and LeJeune
<br />Road by the Astor Companies. CMA was responsible for providing Land Surveying and Geotechnical Engineering, Subsurface
<br />Utility Engineering Services; Utility Coordination and Preliminary Design; Final Engineering; Government Permitting; and
<br />Construction Observation and Administration Assistance. Fee: $ 24,900.00
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />NW 19th St 8" Water Main Replacement - Client No. E15-WASD-03A
<br />Miami, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (If applicable)
<br />Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Associate Engineer. CMA is providing civil engineering for the replacement of an existing 4†water main with a new 8” DIP
<br />water main along NW 19th Street from NW 36th Avenue to NW 33rd Avenue in Miami, FL. CMA's scope includes design,
<br />preparing construction documents including plans and a construction cost estimate and permitting support services. Fee: $ 34,027
<br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2