STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />The project consists of installing a new Biological H2S Biogas Treatment System including five bioreactor vessels and
<br />equipment containers, a new Co-Gen Switchgear Building that will replace the existing electrical rooms in the Co-Gen
<br />Building and substations No. 17 and 18, a new Biogas Treatment Electrical Building, installation of biogas piping from the
<br />Plant 1 digesters to the Biological H2S Treatment System and from the Biological H2S Treatment System to the co-generation
<br />engines in the Co-Gen Building, and replacement of eight rotary sliding vane compressor systems. PSI Scope of Services
<br />included: Pile Testing/Monitoring; Soils, Asphalt, & Concrete Testing; Steel, Structural Steel, & Welding Inspections; Roofing
<br />Inspections & Analysis. Client: Miami-Dade Water and Sewer Department, Consent Decree PMCM Team, CDWWTP (Virginia
<br />Key), 135 San Lorenzo Ave, Suite 600 | Contacts: Stephen D. Cross, Construction Manager | Office: 786-552-4321 | Cell: 786-
<br />858-3210 | stephen.cross@miamidade.gov or Reynaldo Abreu, WASD Project Manager | 786-552-8340 |
<br />RJABR01@miamidade.gov | MDC Contract: E15-WASD-13 | W.O. #7 | CD2.19(2) CDWWTP CO-GEN FACILITY
<br />Project Value: $30M | PSI Services: Materials Field and Laboratory Testing | Dates: 07/2017-07/2018 | PSI Project: 0271136
<br />| PSI Fees: $153k | Role: Contract Manager
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />SR 7 / US 441 Improvements Project
<br />West Park, Miramar, and Hollywood, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2015-2018
<br />CONSTRUCTION (If
<br />applicable) n/a
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />PSI provided Materials Testing for improvements included adding one through lane in each direction for a total of six lanes with
<br />left turn lanes separated by raised medians, constructing new storm sewer system and retention ponds, installing new water
<br />and sewer lines, constructing bus bays at current bus stop locations, constructing curbs and gutters, adding or replacing
<br />sidewalks with ADA compliant ramps on both sides of the road, upgrading existing signalized intersections with mast arms and
<br />adding pedestrian countdown timers at Pembroke Road, Washington Street, and Hollywood Boulevard, improving street
<br />lighting along the corridor by installing new lighting system along the west side of SR 7 / US 441, adding Intelligent
<br />Transportation System components including digital message signs and traffic monitoring cameras, and resurfacing the
<br />roadway. FIN 227774-1-52-01 - from SW 25th Street to Fillmore Street, Broward County, FL | Project Length: 1.79 miles | Project
<br />Limits: SR 7 / US 441 from SW 25th Street to Fillmore Street | Start Date: January 5, 2015 | Completion Date: Summer 2018 |
<br />Contractor: Ferreira Construction Southern Division Co., Inc. | Estimated Construction Cost: $31 million | Role: Contract
<br />Manager
<br />f.
<br />(1) TITLE AND LOCATION (City and State)
<br />Miami-Dade Expressway Authority (MDX) Material Engineering and Testing
<br />Services, Miami-Dade County, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2010-2015
<br />CONSTRUCTION (If
<br />applicable) n/a
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Under this continuing contract PSI was consultant on multiple projects that included: SR 874, SR 112, SR 836, and Central Blvd.
<br />We performed all the verification testing for material used on the projects that also included structural steel plants inspections
<br />and specialty testing such as coating (paint) thickness surveys on steel structures. PSI also performed field verification testing
<br />services and as well as geotechnical work. The start date of this contract was in March 2010 and concluded in March 2015.
<br />Role: Contract Manager; Owner: Miami-Dade Expressway Authority Client: EAC Consulting, Inc. Contact: Sergio Besu, CGC, 305-
<br />265-5491, sbesu@eacconsult.com Dates: 2010-2015 PSI Fees: $500,000 est.
<br />g.
<br />(1) TITLE AND LOCATION (City and State)
<br />Vizcaya Park Phase 3
<br />Miramar, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2015
<br />CONSTRUCTION (If
<br />applicable) n/a
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />The project involves construction of additional soccer field, grass parking, two pavilions, splash pad, new gate and monument
<br />sign at Park entrance. PSI provided a Density Testing, Laboratory Testing, Special Inspector, Engineering & Reporting and
<br />Concrete Sampling and Testing. Concrete and masonry (grout) testing was performed for every 30 cubic yards placed, or for
<br />one day’s production, whichever is less, for concrete slabs, columns, beams and footings. This work included sampling, slump
<br />testing, molding, curing and laboratory testing to determine the unconfined compressive strength of the concrete. Role: Senior
<br />Project Manager Client: Emerald Construction Corp., 1211 Stirling Rd #106, Dania Beach, FL 33004, Ramiro Gamez CGC, LEED
<br />AP BD+C, Director of Construction, ramiro@emeraldconstructioncorp.com │954.241.2583 Date: 04/2015 Services: Materials
<br />Testing & Inspections Construction Cost: $1.8M PSI Fee: $1,907
<br />h.
<br />(1) TITLE AND LOCATION (City and State)
<br />University Center Pedestrian Bridge
<br />Coral Gables, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If
<br />applicable) n/a
<br />
|