Laserfiche WebLink
STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />The project consists of installing a new Biological H2S Biogas Treatment System including five bioreactor vessels and <br />equipment containers, a new Co-Gen Switchgear Building that will replace the existing electrical rooms in the Co-Gen <br />Building and substations No. 17 and 18, a new Biogas Treatment Electrical Building, installation of biogas piping from the <br />Plant 1 digesters to the Biological H2S Treatment System and from the Biological H2S Treatment System to the co-generation <br />engines in the Co-Gen Building, and replacement of eight rotary sliding vane compressor systems. PSI Scope of Services <br />included: Pile Testing/Monitoring; Soils, Asphalt, & Concrete Testing; Steel, Structural Steel, & Welding Inspections; Roofing <br />Inspections & Analysis. Client: Miami-Dade Water and Sewer Department, Consent Decree PMCM Team, CDWWTP (Virginia <br />Key), 135 San Lorenzo Ave, Suite 600 | Contacts: Stephen D. Cross, Construction Manager | Office: 786-552-4321 | Cell: 786- <br />858-3210 | stephen.cross@miamidade.gov or Reynaldo Abreu, WASD Project Manager | 786-552-8340 | <br />RJABR01@miamidade.gov | MDC Contract: E15-WASD-13 | W.O. #7 | CD2.19(2) CDWWTP CO-GEN FACILITY <br />Project Value: $30M | PSI Services: Materials Field and Laboratory Testing | Dates: 07/2017-07/2018 | PSI Project: 0271136 <br />| PSI Fees: $153k | Role: Contract Manager <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />SR 7 / US 441 Improvements Project <br />West Park, Miramar, and Hollywood, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015-2018 <br />CONSTRUCTION (If <br />applicable) n/a <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />PSI provided Materials Testing for improvements included adding one through lane in each direction for a total of six lanes with <br />left turn lanes separated by raised medians, constructing new storm sewer system and retention ponds, installing new water <br />and sewer lines, constructing bus bays at current bus stop locations, constructing curbs and gutters, adding or replacing <br />sidewalks with ADA compliant ramps on both sides of the road, upgrading existing signalized intersections with mast arms and <br />adding pedestrian countdown timers at Pembroke Road, Washington Street, and Hollywood Boulevard, improving street <br />lighting along the corridor by installing new lighting system along the west side of SR 7 / US 441, adding Intelligent <br />Transportation System components including digital message signs and traffic monitoring cameras, and resurfacing the <br />roadway. FIN 227774-1-52-01 - from SW 25th Street to Fillmore Street, Broward County, FL | Project Length: 1.79 miles | Project <br />Limits: SR 7 / US 441 from SW 25th Street to Fillmore Street | Start Date: January 5, 2015 | Completion Date: Summer 2018 | <br />Contractor: Ferreira Construction Southern Division Co., Inc. | Estimated Construction Cost: $31 million | Role: Contract <br />Manager <br />f. <br />(1) TITLE AND LOCATION (City and State) <br />Miami-Dade Expressway Authority (MDX) Material Engineering and Testing <br />Services, Miami-Dade County, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2010-2015 <br />CONSTRUCTION (If <br />applicable) n/a <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Under this continuing contract PSI was consultant on multiple projects that included: SR 874, SR 112, SR 836, and Central Blvd. <br />We performed all the verification testing for material used on the projects that also included structural steel plants inspections <br />and specialty testing such as coating (paint) thickness surveys on steel structures. PSI also performed field verification testing <br />services and as well as geotechnical work. The start date of this contract was in March 2010 and concluded in March 2015. <br />Role: Contract Manager; Owner: Miami-Dade Expressway Authority Client: EAC Consulting, Inc. Contact: Sergio Besu, CGC, 305- <br />265-5491, sbesu@eacconsult.com Dates: 2010-2015 PSI Fees: $500,000 est. <br />g. <br />(1) TITLE AND LOCATION (City and State) <br />Vizcaya Park Phase 3 <br />Miramar, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (If <br />applicable) n/a <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />The project involves construction of additional soccer field, grass parking, two pavilions, splash pad, new gate and monument <br />sign at Park entrance. PSI provided a Density Testing, Laboratory Testing, Special Inspector, Engineering & Reporting and <br />Concrete Sampling and Testing. Concrete and masonry (grout) testing was performed for every 30 cubic yards placed, or for <br />one day’s production, whichever is less, for concrete slabs, columns, beams and footings. This work included sampling, slump <br />testing, molding, curing and laboratory testing to determine the unconfined compressive strength of the concrete. Role: Senior <br />Project Manager Client: Emerald Construction Corp., 1211 Stirling Rd #106, Dania Beach, FL 33004, Ramiro Gamez CGC, LEED <br />AP BD+C, Director of Construction, ramiro@emeraldconstructioncorp.com │954.241.2583 Date: 04/2015 Services: Materials <br />Testing & Inspections Construction Cost: $1.8M PSI Fee: $1,907 <br />h. <br />(1) TITLE AND LOCATION (City and State) <br />University Center Pedestrian Bridge <br />Coral Gables, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If <br />applicable) n/a <br />