Laserfiche WebLink
G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS <br />26. NAMES OF KEY <br />PERSONNEL <br />(From Section E, Block 12) <br />27. ROLE IN THIS <br />CONTRACT <br />(From Section E, Block 13) <br />28. EXAMPLE PROJECTS LISTED IN SECTION F <br />(Fill in "Example Projects Key" section below before completing table. Place "X" under <br />project key number for participation in same or similar role.) <br />1 2 3 4 5 6 7 8 9 10 <br />Camilo Monroy Contract Manager X X X X <br />Jose Gomez, PE, MSc, D.GE, <br />F.ASCE Chief Geotechnical Engineer X X <br />Daniel Gonzalez, PE Project Geotechnical Engineer/ <br />Projects Manager X X X <br />Lucrece Regisme Staff Geotechnical Engineer/ <br />Projects Manager X X <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />29. EXAMPLE PROJECTS KEY <br />NUMBER TITLE OF EXAMPLE PROJECT (FROM SECTION F) NUMBER TITLE OF EXAMPLE PROJECT (FROM SECTION F) <br />1 Miami-Dade Water and Sewer Department <br />Continuing Contract 6 <br />2 Florida City East Palm Drive Canal - Culvert & <br />Roadway Widening 7 <br />3 Miami World Center Block A Proposed Highrise 8 <br />4 Coral Gables Public Safety Building 9 <br />5 10 <br />