Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT <br />Armando Castellon, PE Structural Engineer - Principal in Charge <br />14. YEARS EXPERIENCE 15. FIRM NAME AND LOCATION (City and State) <br />A. Total: 39 B. With Firm: 20 Master Consulting Engineers, Inc. | Ft. Lauderdale, Florida <br />16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION <br />Master of Science in Civil & Structural Engineering, <br />University of Miami <br />Florida Professional Engineer | 43453 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />As President of MCE, Armando has designed and successfully overseen many technically challenging projects. His diverse knowledge <br />of state-of-the-art computer applications helps MCE complete projects professionally, increase our service capabilities and creates a <br />progressive impact in the engineering industry. Armando is results oriented and is committed to supplying solutions. <br />19. RELEVANT PROJECTS <br />(1) TITLE AND LOCATION (City and State)X With Current Firm (2) YEAR <br />COMPLETED <br />A. <br />Golden Beach Town Center | Golden Beach, Florida <br />Role: Principal in Charge | Type: New Construction | Size: 24,000 SF | Construction Cost: +/-$7,815,500 <br />| Description: A new multi-story administration building that will contain the Town Administrative offices. The <br />Civic Center project will also include the complete rehabilitation of the Town’s existing administrative and police <br />facilities. <br />Professional Services <br />Ongoing <br />Construction <br />Ongoing <br />(1) TITLE AND LOCATION (City and State)X With Current Firm (2) YEAR <br />COMPLETED <br />B. <br />City of Pembroke Pines Waster Water | Pembroke Pines, Florida <br />Role: Principal in Charge | Type: Renovation | Size: 26’x50’ | Construction Cost: +/-$284,200 <br />| Description: An existing one-story reinforced concrete building (approximately 26’x50’) with pre-cast flat roof <br />has a window on the NW wall that is to be converted to accommodate a 6’ wide roll-up floor. Evaluated the wall <br />and provided details for the door opening. <br />Professional Services <br />2020 <br />Construction <br />2020 <br />(1) TITLE AND LOCATION (City and State)X With Current Firm (2) YEAR <br />COMPLETED <br />C. <br />Northwest Regional Water Reclamation Facility Administration Building | Tampa, Florida <br />Role: Principal in Charge | Type: Structural Repairs | Size: 14,000 SF | Construction Cost: +/-$7,206,500 <br />| Description: Four-level circular building constructed of cast in place concrete columns, beams/slabs and <br />concrete shear walls. At the Southwest side there is a single-story training building connected to the circular <br />building with enclosed walkways. <br />Professional Services <br />2019 <br />Construction <br />2019 <br />(1) TITLE AND LOCATION (City and State)X With Current Firm (2) YEAR <br />COMPLETED <br />D. <br />Water Works Park | Tampa, Florida <br />Role: Principal in Charge | Type: New Construction | Size: 10,000 SF | Construction Cost: +/-$4,647,685 <br />| Description: The park development included an open gazebo and six pavilions, which includes both <br />single and double pavilions. There is a pump building for the splash pad area and a restroom building as <br />well as a large special events stage, which has a 60 ft. wide opening and a nearly 20 ft overhand. <br />Professional Services <br />2015 <br />Construction <br />2015 <br />(1) TITLE AND LOCATION (City and State)X With Current Firm (2) YEAR <br />COMPLETED <br />E. <br />City of Tampa Waste Water Facility - Site Survey | Tampa, Florida <br />Role: Project Manager | Type: Study | Construction Cost: +/-$7,226,800 | Description: Provide a structural <br />condition assessment report for various structures throughout the entire plant. This condition report included <br />a breakdown of items that need repair based on a priority ranking due to structural condition. All inspections <br />were based on visual observations of exposed elements. <br />Professional Services <br />2015 <br />Construction <br />2015